Fabricated box culvert prefabrication system and construction method
The invention relates to an assembly type box culvert prefabricating system and a construction method. The construction method specifically comprises the following steps that firstly, construction preparation is conducted; secondly, steel bar binding construction is conducted; 3, formwork installation and construction; fourthly, concrete is poured and cured; fifthly, box culvert side plates are installed and constructed; sixthly, a box culvert top plate is installed and constructed; seventhly, a box culvert bottom plate is constructed; and 8, checking and accepting. The invention belongs to the field of bridge engineering construction, not only can improve the side plate steel bar binding precision and efficiency, the template integrity, the bottom plate concrete pouring convenience, the side plate and top plate mounting and positioning efficiency and safety and the like, but also improves the overall construction quality and efficiency, saves manpower and cost, and improves the construction efficiency. And good technical and economic benefits can be obtained when the method is applied to practical engineering.
本发明涉及装配式箱涵预制体系及施工方法,具体包括以下步骤:步骤一,施工准备;步骤二,钢筋绑扎施工;步骤三,模板安装施工;步骤四,浇筑混凝土并养护;步骤五,箱涵侧板安装施工;步骤六,箱涵顶板安装施工;步骤七,箱涵底板施工;步骤八,检查验收。本发明属于桥梁工程施工领域,不但可以提高侧板钢筋绑扎精度和效率、模板整体性、底板混凝土浇筑便捷性、侧板和顶板安装落位效率和安全性等,同时提高了整体施工质量和效率,节省人力和成本,应用于实际工程中可取得较好的技术经济效益。
Fabricated box culvert prefabrication system and construction method
The invention relates to an assembly type box culvert prefabricating system and a construction method. The construction method specifically comprises the following steps that firstly, construction preparation is conducted; secondly, steel bar binding construction is conducted; 3, formwork installation and construction; fourthly, concrete is poured and cured; fifthly, box culvert side plates are installed and constructed; sixthly, a box culvert top plate is installed and constructed; seventhly, a box culvert bottom plate is constructed; and 8, checking and accepting. The invention belongs to the field of bridge engineering construction, not only can improve the side plate steel bar binding precision and efficiency, the template integrity, the bottom plate concrete pouring convenience, the side plate and top plate mounting and positioning efficiency and safety and the like, but also improves the overall construction quality and efficiency, saves manpower and cost, and improves the construction efficiency. And good technical and economic benefits can be obtained when the method is applied to practical engineering.
本发明涉及装配式箱涵预制体系及施工方法,具体包括以下步骤:步骤一,施工准备;步骤二,钢筋绑扎施工;步骤三,模板安装施工;步骤四,浇筑混凝土并养护;步骤五,箱涵侧板安装施工;步骤六,箱涵顶板安装施工;步骤七,箱涵底板施工;步骤八,检查验收。本发明属于桥梁工程施工领域,不但可以提高侧板钢筋绑扎精度和效率、模板整体性、底板混凝土浇筑便捷性、侧板和顶板安装落位效率和安全性等,同时提高了整体施工质量和效率,节省人力和成本,应用于实际工程中可取得较好的技术经济效益。
Fabricated box culvert prefabrication system and construction method
装配式箱涵预制体系及施工方法
WU SHUANGGEN (author) / SU XIANG (author) / SU YILEI (author) / LIU YANZHAO (author) / WU TAO (author) / BAI NAN (author) / HU YUPU (author) / ZHENG JUNYU (author)
2024-06-04
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E01D
BRIDGES
,
Brücken
/
E04G
SCAFFOLDING
,
Baugerüste
Prefabricated square culvert and prefabrication and installation process method thereof
European Patent Office | 2024
|Fabricated box culvert steel formwork system and construction method
European Patent Office | 2023
|