A platform for research: civil engineering, architecture and urbanism
Quickly assembled and disassembled steel platform system and construction method
The invention discloses a steel platform system capable of being quickly assembled and disassembled and a construction method. The steel platform system comprises a platform steel panel, a platform steel beam and a connecting assembly, and the connecting assembly is arranged at the end of the platform steel panel and is modularly spliced with the platform steel beam through the connecting assembly. According to the scheme, the inverted U-shaped grooves are formed in the contact portions of the platform steel panels and the steel beams, the connecting pieces penetrate through the U-shaped grooves to be connected and installed with the steel beams, the platform steel panels are lifted through the U-shaped grooves, and contradiction between the platform steel panels and bolts of the flanges is avoided through the inverted U-shaped grooves. By means of the mode, the problem of space contradiction between the steel panel and the steel beam bolts is effectively solved, the installation speed is greatly increased through steel pin installation, and the steel platform system which can be turned over, is fast to assemble and disassemble and is safe in stress is achieved.
本发明公开了一种快速安拆的钢平台系统及施工方法,其包括平台钢面板,平台钢梁,连接组件,所述连接组件设置于平台钢面板的端部并通过连接组件与平台钢梁进行模块化拼接。本方案通过在平台钢面板与钢梁接触的部位设置倒装U型槽,采用连接件穿过U型槽与钢梁进行连接安装,该方式通过U型槽抬高平台钢面板,并通过U型槽倒装方式避免其与翼缘的螺栓发生矛盾。该方式不仅有效解决了钢面板与钢梁螺栓之间的空间矛盾问题,又通过钢销安装大大提高了安装速度,实现了一种可周转、快速安拆、受力安全的钢平台系统。
Quickly assembled and disassembled steel platform system and construction method
The invention discloses a steel platform system capable of being quickly assembled and disassembled and a construction method. The steel platform system comprises a platform steel panel, a platform steel beam and a connecting assembly, and the connecting assembly is arranged at the end of the platform steel panel and is modularly spliced with the platform steel beam through the connecting assembly. According to the scheme, the inverted U-shaped grooves are formed in the contact portions of the platform steel panels and the steel beams, the connecting pieces penetrate through the U-shaped grooves to be connected and installed with the steel beams, the platform steel panels are lifted through the U-shaped grooves, and contradiction between the platform steel panels and bolts of the flanges is avoided through the inverted U-shaped grooves. By means of the mode, the problem of space contradiction between the steel panel and the steel beam bolts is effectively solved, the installation speed is greatly increased through steel pin installation, and the steel platform system which can be turned over, is fast to assemble and disassemble and is safe in stress is achieved.
本发明公开了一种快速安拆的钢平台系统及施工方法,其包括平台钢面板,平台钢梁,连接组件,所述连接组件设置于平台钢面板的端部并通过连接组件与平台钢梁进行模块化拼接。本方案通过在平台钢面板与钢梁接触的部位设置倒装U型槽,采用连接件穿过U型槽与钢梁进行连接安装,该方式通过U型槽抬高平台钢面板,并通过U型槽倒装方式避免其与翼缘的螺栓发生矛盾。该方式不仅有效解决了钢面板与钢梁螺栓之间的空间矛盾问题,又通过钢销安装大大提高了安装速度,实现了一种可周转、快速安拆、受力安全的钢平台系统。
Quickly assembled and disassembled steel platform system and construction method
一种快速安拆的钢平台系统及施工方法
WANG KANG (author) / YIN GUANGHUA (author) / MA XINXU (author) / LI ZHIYONG (author) / JIA PENG (author) / ZHANG DEKAI (author) / WEI SEN (author)
2024-06-04
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Quickly assembled and disassembled house structure and construction method
European Patent Office | 2022
|European Patent Office | 2023
|