A platform for research: civil engineering, architecture and urbanism
Closed sound barrier structure with snow melting system and construction method thereof
The invention discloses a closed sound barrier structure with a snow melting system and a construction method of the closed sound barrier structure, and belongs to the technical field of road sound barrier construction.The closed sound barrier structure comprises a steel stand column, a sound absorption plate, a baffle assembly, a purline and a snow melting assembly.The inner side plate, the outer side plate and the connecting middle plate in the steel stand column are correspondingly arranged, and the baffle assembly and the purline are connected to the steel stand column; conditions are provided for arrangement of annular/longitudinal heat tracing bands, an annular and longitudinal staggered heating system is formed on the inner side of the closed sound barrier, and the closed sound barrier with the snow melting system is obtained. The closed sound barrier structure with the snow melting system is simple in structure and convenient to construct, road operation noise can be isolated, accumulated snow on the top of the closed sound barrier structure can be quickly melted, the cleaning process of the accumulated snow on the top of the closed sound barrier structure is simplified, and the construction efficiency is improved. The large extra load of the closed sound barrier structure on roads and bridges due to too much accumulated snow is reduced, and the structural reliability and safety of the bridges and the road surfaces are guaranteed.
本发明公开了一种具有融雪系统的封闭式声屏障结构及其施工方法,属于道路声屏障施工技术领域,其包括钢立柱、吸声板、挡板组件、檩条和融雪组件,利用钢立柱中内外侧板、连接中板的对应设置,配合挡板组件和檩条在钢立柱的连接设置,为环/纵向伴热带的设置提供了条件,在封闭式声屏障的内侧形成环纵交错的加热系统,得到具有融雪系统的封闭式声屏障。本发明具有融雪系统的封闭式声屏障结构,其结构简单,施工便捷,能够在满足隔绝道路运营噪声的同时,实现封闭式声屏障结构顶部积雪的快速融化,简化封闭式声屏障顶部积雪的清理过程,降低封闭式声屏障结构因积雪过多而对道路、桥梁产生较大的额外负载,保证桥梁、路面设置的结构可靠性和安全性。
Closed sound barrier structure with snow melting system and construction method thereof
The invention discloses a closed sound barrier structure with a snow melting system and a construction method of the closed sound barrier structure, and belongs to the technical field of road sound barrier construction.The closed sound barrier structure comprises a steel stand column, a sound absorption plate, a baffle assembly, a purline and a snow melting assembly.The inner side plate, the outer side plate and the connecting middle plate in the steel stand column are correspondingly arranged, and the baffle assembly and the purline are connected to the steel stand column; conditions are provided for arrangement of annular/longitudinal heat tracing bands, an annular and longitudinal staggered heating system is formed on the inner side of the closed sound barrier, and the closed sound barrier with the snow melting system is obtained. The closed sound barrier structure with the snow melting system is simple in structure and convenient to construct, road operation noise can be isolated, accumulated snow on the top of the closed sound barrier structure can be quickly melted, the cleaning process of the accumulated snow on the top of the closed sound barrier structure is simplified, and the construction efficiency is improved. The large extra load of the closed sound barrier structure on roads and bridges due to too much accumulated snow is reduced, and the structural reliability and safety of the bridges and the road surfaces are guaranteed.
本发明公开了一种具有融雪系统的封闭式声屏障结构及其施工方法,属于道路声屏障施工技术领域,其包括钢立柱、吸声板、挡板组件、檩条和融雪组件,利用钢立柱中内外侧板、连接中板的对应设置,配合挡板组件和檩条在钢立柱的连接设置,为环/纵向伴热带的设置提供了条件,在封闭式声屏障的内侧形成环纵交错的加热系统,得到具有融雪系统的封闭式声屏障。本发明具有融雪系统的封闭式声屏障结构,其结构简单,施工便捷,能够在满足隔绝道路运营噪声的同时,实现封闭式声屏障结构顶部积雪的快速融化,简化封闭式声屏障顶部积雪的清理过程,降低封闭式声屏障结构因积雪过多而对道路、桥梁产生较大的额外负载,保证桥梁、路面设置的结构可靠性和安全性。
Closed sound barrier structure with snow melting system and construction method thereof
一种具有融雪系统的封闭式声屏障结构及其施工方法
HU ZHE (author) / ZHANG LIANGTAO (author) / WANG ZHENGANG (author) / ZHANG LIUJUN (author) / ZHOU HUIYU (author) / CAO YIXING (author) / CUI XU (author) / YANG QIANQIAN (author) / CAI TAO (author) / SUN ZONGLIANG (author)
2024-06-14
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04D
ROOF COVERINGS
,
Dacheindeckungen
European Patent Office | 2024
|Snow melting pavement structure and construction method thereof
European Patent Office | 2022
|Roof snow melting system and snow melting method thereof
European Patent Office | 2024
|Standardized semi-closed sound barrier construction method
European Patent Office | 2024
|