Tower and hoisting method thereof
The invention relates to the technical field of tower hoisting, aims to solve the problem of how to improve the mounting efficiency of an elevated torch, and provides a tower and a hoisting method thereof. The tower hoisting method provides a crane and a plurality of tower sections. The multiple tower sections are arranged at intervals, the crane moves to one tower section and lifts the tower section, the crane places the tower section at the target position, and the crane lifts the tower section to the target position in sequence so that the multiple tower sections can be stacked and installed together. According to the tower frame, the multiple tower sections are installed in a stacked mode, the lifting lugs are arranged on the tops of the tower sections, in this way, the tower sections can be conveniently lifted by a crane, the lifting lugs correspond to the supporting legs of the tower sections on the lifting lugs to support the tower sections on the lifting lugs, and therefore the multiple tower sections can be conveniently aligned in the vertical direction and stacked stably; according to the tower hoisting method, a plurality of tower sections are arranged at intervals, so that a crane can hoist the tower sections to target positions in sequence, and the effect of improving the tower mounting efficiency is achieved.
本申请涉及塔架吊装技术领域,旨在解决如何提升高架火炬的安装效率的问题,提供塔架及其吊装方法。其中,塔架吊装方法提供吊车和多个塔段。多个塔段间隔设置,吊车移动至一个塔段并且吊起塔段,吊车放置塔段于目标位置,吊车依次吊起塔段至目标位置以使多个塔段堆叠安装在一起。塔架通过多个塔段堆叠安装,并且在塔段的顶部设置吊耳,如此便于塔段被吊车吊起,并且吊耳与上方的塔段的支撑脚对应以支撑位于上方的塔段,因此多个塔段便于沿着竖直方向对准并且叠放稳定;塔架吊装方法通过多个塔段间隔设置,以便于吊车依次吊起塔段至目标位置,以达到提高塔架安装效率的效果。
Tower and hoisting method thereof
The invention relates to the technical field of tower hoisting, aims to solve the problem of how to improve the mounting efficiency of an elevated torch, and provides a tower and a hoisting method thereof. The tower hoisting method provides a crane and a plurality of tower sections. The multiple tower sections are arranged at intervals, the crane moves to one tower section and lifts the tower section, the crane places the tower section at the target position, and the crane lifts the tower section to the target position in sequence so that the multiple tower sections can be stacked and installed together. According to the tower frame, the multiple tower sections are installed in a stacked mode, the lifting lugs are arranged on the tops of the tower sections, in this way, the tower sections can be conveniently lifted by a crane, the lifting lugs correspond to the supporting legs of the tower sections on the lifting lugs to support the tower sections on the lifting lugs, and therefore the multiple tower sections can be conveniently aligned in the vertical direction and stacked stably; according to the tower hoisting method, a plurality of tower sections are arranged at intervals, so that a crane can hoist the tower sections to target positions in sequence, and the effect of improving the tower mounting efficiency is achieved.
本申请涉及塔架吊装技术领域,旨在解决如何提升高架火炬的安装效率的问题,提供塔架及其吊装方法。其中,塔架吊装方法提供吊车和多个塔段。多个塔段间隔设置,吊车移动至一个塔段并且吊起塔段,吊车放置塔段于目标位置,吊车依次吊起塔段至目标位置以使多个塔段堆叠安装在一起。塔架通过多个塔段堆叠安装,并且在塔段的顶部设置吊耳,如此便于塔段被吊车吊起,并且吊耳与上方的塔段的支撑脚对应以支撑位于上方的塔段,因此多个塔段便于沿着竖直方向对准并且叠放稳定;塔架吊装方法通过多个塔段间隔设置,以便于吊车依次吊起塔段至目标位置,以达到提高塔架安装效率的效果。
Tower and hoisting method thereof
塔架及其吊装方法
ZHANG BAOFENG (author) / CHEN LINHUI (author) / SONG YINGPING (author) / ZHANG YIFENG (author)
2024-06-14
Patent
Electronic Resource
Chinese