A platform for research: civil engineering, architecture and urbanism
Hoisting system and hoisting method for steel tower sections
The invention relates to a hoisting system and method for steel tower sections and relates to the technical field of bridge construction. The hoisting system comprises an erected main tower and hoisting equipment, and the hoisting equipment comprises a tower crane assembly used for hoisting a to-be-erected steel tower; and a supporting foundation which is located at the bottom of the tower crane assembly, and the supporting foundation is installed on the side wall of the erected main tower and supports the tower crane assembly in the air. According to the system, facility consumables in hoisting construction can be saved, the construction period is ensured, high-altitude hoisting of the steel tower sections can be considered, and the construction cost is low.
本申请涉及一种钢塔节段的吊装系统和吊装方法,涉及桥梁建筑技术领域,所述吊装系统包括已架主塔和吊装设备,所述吊装设备包括:用于吊装待架钢塔的塔吊总成;支撑基础,其位于所述塔吊总成的底部,且所述支撑基础安装在所述已架主塔侧壁上,并支撑所述塔吊总成于空中。本申请能够节省吊装施工中的设施耗材,确保施工工期,能够同时兼顾高空吊装钢塔节段和施工成本低。
Hoisting system and hoisting method for steel tower sections
The invention relates to a hoisting system and method for steel tower sections and relates to the technical field of bridge construction. The hoisting system comprises an erected main tower and hoisting equipment, and the hoisting equipment comprises a tower crane assembly used for hoisting a to-be-erected steel tower; and a supporting foundation which is located at the bottom of the tower crane assembly, and the supporting foundation is installed on the side wall of the erected main tower and supports the tower crane assembly in the air. According to the system, facility consumables in hoisting construction can be saved, the construction period is ensured, high-altitude hoisting of the steel tower sections can be considered, and the construction cost is low.
本申请涉及一种钢塔节段的吊装系统和吊装方法,涉及桥梁建筑技术领域,所述吊装系统包括已架主塔和吊装设备,所述吊装设备包括:用于吊装待架钢塔的塔吊总成;支撑基础,其位于所述塔吊总成的底部,且所述支撑基础安装在所述已架主塔侧壁上,并支撑所述塔吊总成于空中。本申请能够节省吊装施工中的设施耗材,确保施工工期,能够同时兼顾高空吊装钢塔节段和施工成本低。
Hoisting system and hoisting method for steel tower sections
一种钢塔节段的吊装系统和吊装方法
DUN LIN (author) / SHEN DACAI (author) / LI KEYAO (author) / ZHAO KUNPENG (author) / ZHANG AIHUA (author) / XU QILI (author) / WANG YINFENG (author) / PAN BO (author) / LIU AILIN (author) / WANG LINGXIA (author)
2021-05-28
Patent
Electronic Resource
Chinese
European Patent Office | 2015
|European Patent Office | 2020
|