Arch bridge arch rib jig frame construction method
The invention discloses an arch bridge arch rib jig frame construction method, and relates to the technical field of arch bridge arch rib construction. Comprising the steps of S1, planning an equipment storage area and a construction area; s2, model positioning: positioning an arch rib jig frame by utilizing a technology, and determining the segment coordinates and sizes of arch ribs; s3, a track is arranged, specifically, the track is arranged on the model according to the position of the arch rib jig frame; s4, rails are laid, specifically, the rails are laid on the steel structure machining site according to the positions determined by the model; and S5, an arch rib jig frame and a limiting device are customized. By means of the BIM technology and design and construction of the jig frame track, the jig frame track is formed at a time, the position of the jig frame is adjusted subsequently according to the machined arch rib sections, masonry structures are reduced, after the arch rib is machined, the track and the jig frame are easy and convenient to dismantle, an existing site cannot be damaged, and the site recovery cost is reduced.
本发明公开了一种拱桥拱肋胎架施工方法,涉及拱桥拱肋施工建造技术领域。包括S1:规划设备存放区和施工区;S2:模型定位,利用技术对拱肋胎架进行定位,确定拱肋的节段坐标和尺寸;S3:设置轨道,根据拱肋胎架位置在模型上设置轨道;S4:铺设轨道,在钢结构加工场地按照模型确定的位置铺设轨道;S5:定做拱肋胎架和限位装置。本发明通过BIM技术和胎架轨道的设计施工,胎架轨道一次成型,后续根据加工拱肋节段调整胎架位置,减少了圬工构造物,并且拱肋加工完成后,轨道及胎架拆除简便,不会对现有场地造成破坏,减少场地恢复成本。
Arch bridge arch rib jig frame construction method
The invention discloses an arch bridge arch rib jig frame construction method, and relates to the technical field of arch bridge arch rib construction. Comprising the steps of S1, planning an equipment storage area and a construction area; s2, model positioning: positioning an arch rib jig frame by utilizing a technology, and determining the segment coordinates and sizes of arch ribs; s3, a track is arranged, specifically, the track is arranged on the model according to the position of the arch rib jig frame; s4, rails are laid, specifically, the rails are laid on the steel structure machining site according to the positions determined by the model; and S5, an arch rib jig frame and a limiting device are customized. By means of the BIM technology and design and construction of the jig frame track, the jig frame track is formed at a time, the position of the jig frame is adjusted subsequently according to the machined arch rib sections, masonry structures are reduced, after the arch rib is machined, the track and the jig frame are easy and convenient to dismantle, an existing site cannot be damaged, and the site recovery cost is reduced.
本发明公开了一种拱桥拱肋胎架施工方法,涉及拱桥拱肋施工建造技术领域。包括S1:规划设备存放区和施工区;S2:模型定位,利用技术对拱肋胎架进行定位,确定拱肋的节段坐标和尺寸;S3:设置轨道,根据拱肋胎架位置在模型上设置轨道;S4:铺设轨道,在钢结构加工场地按照模型确定的位置铺设轨道;S5:定做拱肋胎架和限位装置。本发明通过BIM技术和胎架轨道的设计施工,胎架轨道一次成型,后续根据加工拱肋节段调整胎架位置,减少了圬工构造物,并且拱肋加工完成后,轨道及胎架拆除简便,不会对现有场地造成破坏,减少场地恢复成本。
Arch bridge arch rib jig frame construction method
一种拱桥拱肋胎架施工方法
KANG YAFEI (author) / WANG HUAIJIAN (author) / WANG JINGYU (author) / YANG HAO (author) / YAN MINGBO (author) / MO JINFENG (author) / LONG XUE (author) / CHEN WEI (author) / XIE PENG (author) / ZHANG CHI (author)
2024-06-25
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Deck type arch bridge construction method based on steel arch frame
European Patent Office | 2024
|Arch bridge main arch construction method and assembly type arch bridge construction method
European Patent Office | 2020
|Continuous arch bridge and arch bridge construction method
European Patent Office | 2024
|Arch bridge arch foot foundation structure, construction method thereof and arch bridge
European Patent Office | 2021
|