A platform for research: civil engineering, architecture and urbanism
Self-propelled bridge pouring working platform and construction method thereof
The invention discloses a self-propelled bridge pouring working platform and a construction method thereof. The working platform comprises a pier top shifting mechanism, a bottom die transverse moving device, a bottom die system, a wing die system, an inner die system, an end die system, a bottom die moving platform, a hydraulic system, an electric control system and the like. The construction method comprises the steps that S1, the bridge pouring working platform is used for pouring and curing n and n + 1 pier span concrete, and during the period, an integral reinforcement cage is bound on a movable jig frame on a poured beam surface behind; s2, n and n + 1 pier span concrete curing and tensioning are completed, and demolding, mold opening and the like of a bridge pouring working platform are completed; the method has the beneficial effects that the steel bar binding procedure which consumes the longest time in bridge construction and the bridge pouring, curing and tensioning procedures can be carried out at the same time, meanwhile, the construction procedures are simplified, and the efficiency of a movable formwork beam manufacturing worker is effectively improved.
本发明公开了一种自行式桥梁浇筑工作平台及其施工方法,其中工作平台包括墩顶移位机构、底模横移装置、底模系统、翼模系统、内模系统、端模系统、底模移动平台、液压系统和电控系统等;施工方法包括:S1、桥梁浇筑工作平台在n、n+1墩跨混凝土浇注、养生,期间在后方已浇筑梁面上的移动胎架上绑扎整体钢筋笼;S2、n、n+1墩跨混凝土养生、张拉完成,桥梁浇筑工作平台完成脱模、开模等;本发明所具有的有益效果为:可使桥梁施工中耗时最长的绑扎钢筋工序与桥梁浇注、养生及张拉工序同时展开,同时将施工工序简化,有效提高移动模架制梁工效率。
Self-propelled bridge pouring working platform and construction method thereof
The invention discloses a self-propelled bridge pouring working platform and a construction method thereof. The working platform comprises a pier top shifting mechanism, a bottom die transverse moving device, a bottom die system, a wing die system, an inner die system, an end die system, a bottom die moving platform, a hydraulic system, an electric control system and the like. The construction method comprises the steps that S1, the bridge pouring working platform is used for pouring and curing n and n + 1 pier span concrete, and during the period, an integral reinforcement cage is bound on a movable jig frame on a poured beam surface behind; s2, n and n + 1 pier span concrete curing and tensioning are completed, and demolding, mold opening and the like of a bridge pouring working platform are completed; the method has the beneficial effects that the steel bar binding procedure which consumes the longest time in bridge construction and the bridge pouring, curing and tensioning procedures can be carried out at the same time, meanwhile, the construction procedures are simplified, and the efficiency of a movable formwork beam manufacturing worker is effectively improved.
本发明公开了一种自行式桥梁浇筑工作平台及其施工方法,其中工作平台包括墩顶移位机构、底模横移装置、底模系统、翼模系统、内模系统、端模系统、底模移动平台、液压系统和电控系统等;施工方法包括:S1、桥梁浇筑工作平台在n、n+1墩跨混凝土浇注、养生,期间在后方已浇筑梁面上的移动胎架上绑扎整体钢筋笼;S2、n、n+1墩跨混凝土养生、张拉完成,桥梁浇筑工作平台完成脱模、开模等;本发明所具有的有益效果为:可使桥梁施工中耗时最长的绑扎钢筋工序与桥梁浇注、养生及张拉工序同时展开,同时将施工工序简化,有效提高移动模架制梁工效率。
Self-propelled bridge pouring working platform and construction method thereof
一种自行式桥梁浇筑工作平台及其施工方法
DAI YU (author) / CAO CHANGXING (author) / ZHANG JUNYAN (author) / CHEN DELI (author) / QI LEI (author) / ZHANG ZHIHUA (author) / LIU SHUXIN (author) / CHENG BO (author) / CHEN WEN (author) / QU CHANGLI (author)
2024-06-25
Patent
Electronic Resource
Chinese
Self-propelled bridge deck pavement concrete cloth pouring device and pouring method thereof
European Patent Office | 2022
|Self-propelled barge pouring system and overwater pouring method thereof
European Patent Office | 2024
|Bridge construction pouring device and using method thereof
European Patent Office | 2023
|Concrete pouring device for bridge construction and pouring method
European Patent Office | 2023
|