A platform for research: civil engineering, architecture and urbanism
Tunnel optimization structure and construction method thereof
The invention provides a tunnel optimization structure and a construction method thereof.A tunnel is located in a mountain, an inlet of the tunnel is connected with a channel, before the tunnel is excavated, a supporting platform is arranged at the inlet of the tunnel, the supporting platform is used for conducting operation construction at the inlet of the tunnel, the operation face is enlarged, and after the tunnel construction is completed, the supporting platform is arranged at the inlet of the tunnel; the base and the hoist are arranged through the supporting platform, the bulkhead gate is arranged at the corresponding channel position, and the hoist is arranged through the bulkhead gate and the supporting platform, so that allocation management of the tunnel water volume under the special working condition is achieved.
本发明提供一种隧洞优化结构及其施工方法,所述隧洞位于山体中,所述隧洞的进口处与渠道连接,在隧洞开挖前,在隧洞进口处设置支撑平台,并利用支撑平台进行隧洞进口处的作业施工,扩大作业面,在隧洞施工完成后,利用支撑平台设置底座和启闭机,在对应的渠道位置处设置平板闸门,通过设置平板闸门,利用支撑平台实现启闭机设置,以实现特殊工况下对隧洞水量的调配管理。
Tunnel optimization structure and construction method thereof
The invention provides a tunnel optimization structure and a construction method thereof.A tunnel is located in a mountain, an inlet of the tunnel is connected with a channel, before the tunnel is excavated, a supporting platform is arranged at the inlet of the tunnel, the supporting platform is used for conducting operation construction at the inlet of the tunnel, the operation face is enlarged, and after the tunnel construction is completed, the supporting platform is arranged at the inlet of the tunnel; the base and the hoist are arranged through the supporting platform, the bulkhead gate is arranged at the corresponding channel position, and the hoist is arranged through the bulkhead gate and the supporting platform, so that allocation management of the tunnel water volume under the special working condition is achieved.
本发明提供一种隧洞优化结构及其施工方法,所述隧洞位于山体中,所述隧洞的进口处与渠道连接,在隧洞开挖前,在隧洞进口处设置支撑平台,并利用支撑平台进行隧洞进口处的作业施工,扩大作业面,在隧洞施工完成后,利用支撑平台设置底座和启闭机,在对应的渠道位置处设置平板闸门,通过设置平板闸门,利用支撑平台实现启闭机设置,以实现特殊工况下对隧洞水量的调配管理。
Tunnel optimization structure and construction method thereof
一种隧洞优化结构及其施工方法
CHEN YUNFEI (author) / QI JIAN (author) / SHI ZHAN (author) / LI DONGYANG (author) / SHI XINYI (author) / YUE CHANGXU (author) / ZHANG SHILEI (author) / SUN SEN (author) / WU JIXIANG (author) / CAI LUNBIN (author)
2024-06-25
Patent
Electronic Resource
Chinese
SUBMARINE TUNNEL STRUCTURE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2015
|Bridge and tunnel co-construction structure and construction method thereof
European Patent Office | 2020
|Sewage tunnel segment structure and construction method thereof
European Patent Office | 2022
|Bridge and tunnel combined construction structure and construction method thereof
European Patent Office | 2023
|Open cut tunnel structure and construction method thereof
European Patent Office | 2021
|