Building column beam pouring construction device and construction method
The invention relates to the technical field of building construction, in particular to a building column beam pouring construction device and a construction method.The building column beam pouring construction device comprises first side plates, second side plates and a baffle, the first side plates are arranged in two sets, each set comprises two first side plates, the baffle is installed between the two first side plates, and the second side plates are installed between the two sets of first side plates; according to the size of a column beam needing to be poured on site, baffles with different widths are selected to be installed between the two first side plates, second lap joint grooves in the two ends of the baffles are in lap joint with first lap joint grooves of the two first side plates correspondingly, and then steel pipe sleeves and limiting blocks at the two ends of the back arris are adjusted to proper positions; and then the two ends of the back ridge are inserted into the two containing grooves correspondingly, the limiting blocks are located at the outer end openings of the containing grooves, at the moment, the inner end side wall of the back ridge makes contact with the outer end side wall of the baffle, the effect of adjusting the size of the first side plate is achieved, and formwork erecting can be conveniently conducted on column beams of different sizes.
本发明涉及建筑施工技术领域,具体为一种建筑柱梁浇筑施工装置及施工方法,包括:侧板一、侧板二和挡板,所述侧板一设有两组,每组设有两个,两个侧板一之间安装挡板,两组侧板一之间安装侧板二;根据现场需要浇筑的柱梁的尺寸,选择不同宽度的挡板安装在两个侧板一之间,让挡板两端的搭接槽二分别和两个侧板一的搭接槽一搭接,然后将背楞的两端的钢管套和限位块调节到合适的位置,然后将背楞的两端分别插入两个放置槽内,并让限位块位于放置槽的外端口,此时背楞的内端侧壁和挡板的外端侧壁相接触,起到调节侧板一的尺寸的作用,便于对不同尺寸的柱梁进行支模。
Building column beam pouring construction device and construction method
The invention relates to the technical field of building construction, in particular to a building column beam pouring construction device and a construction method.The building column beam pouring construction device comprises first side plates, second side plates and a baffle, the first side plates are arranged in two sets, each set comprises two first side plates, the baffle is installed between the two first side plates, and the second side plates are installed between the two sets of first side plates; according to the size of a column beam needing to be poured on site, baffles with different widths are selected to be installed between the two first side plates, second lap joint grooves in the two ends of the baffles are in lap joint with first lap joint grooves of the two first side plates correspondingly, and then steel pipe sleeves and limiting blocks at the two ends of the back arris are adjusted to proper positions; and then the two ends of the back ridge are inserted into the two containing grooves correspondingly, the limiting blocks are located at the outer end openings of the containing grooves, at the moment, the inner end side wall of the back ridge makes contact with the outer end side wall of the baffle, the effect of adjusting the size of the first side plate is achieved, and formwork erecting can be conveniently conducted on column beams of different sizes.
本发明涉及建筑施工技术领域,具体为一种建筑柱梁浇筑施工装置及施工方法,包括:侧板一、侧板二和挡板,所述侧板一设有两组,每组设有两个,两个侧板一之间安装挡板,两组侧板一之间安装侧板二;根据现场需要浇筑的柱梁的尺寸,选择不同宽度的挡板安装在两个侧板一之间,让挡板两端的搭接槽二分别和两个侧板一的搭接槽一搭接,然后将背楞的两端的钢管套和限位块调节到合适的位置,然后将背楞的两端分别插入两个放置槽内,并让限位块位于放置槽的外端口,此时背楞的内端侧壁和挡板的外端侧壁相接触,起到调节侧板一的尺寸的作用,便于对不同尺寸的柱梁进行支模。
Building column beam pouring construction device and construction method
一种建筑柱梁浇筑施工装置及施工方法
ZHOU ZIHAN (author) / YUAN ZHUANG (author) / WEI SHUSHENG (author) / FENG QI (author) / ZHOU HONGYU (author) / HOU LIANGLEI (author)
2024-06-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building beam-column integrated pouring formwork system and construction method
European Patent Office | 2023
|Reinforced concrete beam column pouring construction method
European Patent Office | 2021
|