Construction process of anchoring type mixed lawn in football field
The invention relates to a construction technology of a football field anchoring type mixed lawn, and belongs to the technical field of mixed lawns.The construction technology comprises the following steps that S1, measurement and positioning are conducted, specifically, 0.3% slope is designed according to a drawing, and a flat bucket forklift is adopted to conduct field primary leveling and then conduct fine leveling; s2, pipeline laying of a sprinkling irrigation system: paying off and ditching pipelines of the whole sprinkling irrigation system according to a sprinkling irrigation system diagram; s3, laying an isolating layer, namely laying a layer of geotechnical cloth on the bottom ditch wall of the drainage ditch above the plain soil layer; s4, drainage pipelines are laid, wherein the blind ditches are spaced, and the drainage pipelines are arranged in a straight line shape; s5, a drainage gravel layer is laid, wherein gravel is laid at one corner close to the court channel in a mechanical and manual combined mode; s6, a sand layer is laid, specifically, the sand layer is of a sand base structure, lower layer sand of 15 cm is laid firstly, and then upper layer sand of 15 cm is laid; s7, lawn planting, wherein appropriate grass seeds are selected for lawn planting; and S8, after the lawn is planted, maintained and formed, grass fibers are planted through an adjustable grass planting machine. The drainage device has a better drainage effect.
本申请涉及一种足球场锚固式混合草坪的施工工艺,属于混合草坪的技术领域,其包括以下步骤:S1、测量定位:按照图纸设计0.3%放坡,采用平斗铲车,进行场地初平,再进行精平;S2、喷灌系统管道铺设:整个灌溉系统的管道按照喷灌系统图放线挖沟;S3、铺设隔离层:素土层上方包括排水沟底沟壁铺设土工布一层;S4、排水管道铺设:盲沟间隔,排水管按”一字”形排布;S5、排水碎石层铺设:在靠近球场通道的一角,用机械结合人工铺设碎石;S6、砂层铺设:砂层采用砂基结构,先铺设15cm下层砂,再铺设15cm上层砂;S7、种植草坪:选择合适的草种,进行草坪的种植;S8、在草坪建植养护成坪后采用可调节植草机植入草纤维。本申请具有排水效果更好的效果。
Construction process of anchoring type mixed lawn in football field
The invention relates to a construction technology of a football field anchoring type mixed lawn, and belongs to the technical field of mixed lawns.The construction technology comprises the following steps that S1, measurement and positioning are conducted, specifically, 0.3% slope is designed according to a drawing, and a flat bucket forklift is adopted to conduct field primary leveling and then conduct fine leveling; s2, pipeline laying of a sprinkling irrigation system: paying off and ditching pipelines of the whole sprinkling irrigation system according to a sprinkling irrigation system diagram; s3, laying an isolating layer, namely laying a layer of geotechnical cloth on the bottom ditch wall of the drainage ditch above the plain soil layer; s4, drainage pipelines are laid, wherein the blind ditches are spaced, and the drainage pipelines are arranged in a straight line shape; s5, a drainage gravel layer is laid, wherein gravel is laid at one corner close to the court channel in a mechanical and manual combined mode; s6, a sand layer is laid, specifically, the sand layer is of a sand base structure, lower layer sand of 15 cm is laid firstly, and then upper layer sand of 15 cm is laid; s7, lawn planting, wherein appropriate grass seeds are selected for lawn planting; and S8, after the lawn is planted, maintained and formed, grass fibers are planted through an adjustable grass planting machine. The drainage device has a better drainage effect.
本申请涉及一种足球场锚固式混合草坪的施工工艺,属于混合草坪的技术领域,其包括以下步骤:S1、测量定位:按照图纸设计0.3%放坡,采用平斗铲车,进行场地初平,再进行精平;S2、喷灌系统管道铺设:整个灌溉系统的管道按照喷灌系统图放线挖沟;S3、铺设隔离层:素土层上方包括排水沟底沟壁铺设土工布一层;S4、排水管道铺设:盲沟间隔,排水管按”一字”形排布;S5、排水碎石层铺设:在靠近球场通道的一角,用机械结合人工铺设碎石;S6、砂层铺设:砂层采用砂基结构,先铺设15cm下层砂,再铺设15cm上层砂;S7、种植草坪:选择合适的草种,进行草坪的种植;S8、在草坪建植养护成坪后采用可调节植草机植入草纤维。本申请具有排水效果更好的效果。
Construction process of anchoring type mixed lawn in football field
一种足球场锚固式混合草坪的施工工艺
CAI HAIBO (author) / ZHANG QIANG (author) / ZHANG SHUAI (author)
2024-07-09
Patent
Electronic Resource
Chinese
Construction method for transforming natural lawn football field into artificial lawn football field
European Patent Office | 2021
|European Patent Office | 2022
|Construction method for replacing lawn in artificial grass football field
European Patent Office | 2023
|