A platform for research: civil engineering, architecture and urbanism
Mounting joint of ALC parapet wall and gutter and construction method of mounting joint
The invention discloses an ALC parapet wall and gutter mounting node and a construction method thereof.The ALC parapet wall and gutter mounting node is applied to a steel structure plant and comprises a purline, an ALC parapet wall, a gutter and a batch member; the ALC parapet wall is embedded in the steel beam, so that the height of the ALC parapet wall is not limited, the purline is arranged on the cross beam, and the gutter is placed on the purline and the steel beam, so that the gutter is stably supported, and the problem of gutter installation when a steel structure metal roof structure building adopts an ALC plate outer wall is solved; and the other end of the water filling piece extends into the gutter and is obliquely arranged towards one side of the cross beam from top to bottom, so that the leakage-proof performance is improved, and the mounting node is simple in structure, high in operability, low in cost and capable of shortening the construction period.
本发明公开了一种ALC女儿墙与天沟的安装节点及其施工方法,ALC女儿墙与天沟的安装节点应用于钢结构厂房,包括:檩条、ALC女儿墙、天沟和批水件;通过将ALC女儿墙内嵌设于钢梁内,从而使得ALC女儿墙的高度不受限制,在横梁上设置檩条,将天沟搁置于檩条和钢梁上,以对天沟进行平稳支撑,从而解决了钢结构金属屋面结构建筑采用ALC板外墙时天沟的安装问题,在天沟的上方设置批水件,批水件的另一端延伸至所述天沟内,且自上而下朝向所述横梁的一侧倾斜设置,从而提升防漏性能,该安装节点结构简单,可操作性强,成本低,可缩短施工周期。
Mounting joint of ALC parapet wall and gutter and construction method of mounting joint
The invention discloses an ALC parapet wall and gutter mounting node and a construction method thereof.The ALC parapet wall and gutter mounting node is applied to a steel structure plant and comprises a purline, an ALC parapet wall, a gutter and a batch member; the ALC parapet wall is embedded in the steel beam, so that the height of the ALC parapet wall is not limited, the purline is arranged on the cross beam, and the gutter is placed on the purline and the steel beam, so that the gutter is stably supported, and the problem of gutter installation when a steel structure metal roof structure building adopts an ALC plate outer wall is solved; and the other end of the water filling piece extends into the gutter and is obliquely arranged towards one side of the cross beam from top to bottom, so that the leakage-proof performance is improved, and the mounting node is simple in structure, high in operability, low in cost and capable of shortening the construction period.
本发明公开了一种ALC女儿墙与天沟的安装节点及其施工方法,ALC女儿墙与天沟的安装节点应用于钢结构厂房,包括:檩条、ALC女儿墙、天沟和批水件;通过将ALC女儿墙内嵌设于钢梁内,从而使得ALC女儿墙的高度不受限制,在横梁上设置檩条,将天沟搁置于檩条和钢梁上,以对天沟进行平稳支撑,从而解决了钢结构金属屋面结构建筑采用ALC板外墙时天沟的安装问题,在天沟的上方设置批水件,批水件的另一端延伸至所述天沟内,且自上而下朝向所述横梁的一侧倾斜设置,从而提升防漏性能,该安装节点结构简单,可操作性强,成本低,可缩短施工周期。
Mounting joint of ALC parapet wall and gutter and construction method of mounting joint
一种ALC女儿墙与天沟的安装节点及其施工方法
XI WEIXIANG (author) / YU HAO (author) / MENG XIANGCHONG (author) / WANG LUYANG (author) / LI ZHIXIAO (author) / GONG WEIXING (author) / KONG XIANGSHUAI (author) / LI JINGSHU (author) / ZHANG PENGFEI (author)
2024-07-09
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Lightning protection support mounting method for roof parapet wall mounting
European Patent Office | 2023
|Formwork-free integrated rapid construction method for gutter parapet wall
European Patent Office | 2024
|Auxiliary mounting device for realizing quick mounting of whole house parapet wall
European Patent Office | 2022
|GUTTER MOUNTING MEMBER, GUTTER STRUCTURE, AND CONSTRUCTION METHOD FOR GUTTER STRUCTURE
European Patent Office | 2024
|