A platform for research: civil engineering, architecture and urbanism
Harbor basin road construction method, harbor basin road construction system and electronic equipment
The invention provides a harbor basin road construction method and system and electronic equipment, and the construction method comprises the following steps: S1, constructing a harbor basin and a flood prevention system, and filling a roadbed; s2, laying the gallery pavement at fixed distance; s3, burying a soil layer monitoring terminal at a fixed depth to monitor a sandy soil change state; s4, an isolation belt is built on the ground of the gallery; s5, the roadbed maintenance state is monitored, and if data abnormity occurs, an alarm is automatically given; and S6, repairing the roadbed. According to the technical scheme, the roadbed maintenance state is monitored in real time by laying the gallery pavement at a fixed distance and burying the monitoring terminal at a fixed depth, an alarm is automatically given if data abnormity is generated, a worker can trim the roadbed in time, construction can be carried out only by blocking the width of one lane at most in the construction and repair process, and the construction efficiency is improved. The influence on surrounding normal traffic or work is avoided to the maximum extent, the road breaking and paving processes are omitted, and the whole construction process and the road closure period are greatly shortened.
本申请提供了一种港池道路建造方法、建造系统及电子设备,该建造方法包括以下步骤:S1:建造港池及防汛体系,并填筑路基;S2:定距敷设廊道路面;S3:定深埋设土层监控终端,以监控砂土变化状态;S4:于廊道地面建造隔离带;S5:监测路基维护状态,若产生数据异常则自动报警;S6:修复路基。本申请技术方案通过定距敷设廊道路面和定深埋设监控终端,实时监测路基维护状态,若产生数据异常则自动报警,工作人员能够及时对路基进行修整,施工修复过程中至多只要封锁一个车道的宽度进行施工,最大程度上避免了对周边正常交通或工作的影响,且省去了破路和铺路的过程,整个施工过程和封路的周期均得以大大缩短。
Harbor basin road construction method, harbor basin road construction system and electronic equipment
The invention provides a harbor basin road construction method and system and electronic equipment, and the construction method comprises the following steps: S1, constructing a harbor basin and a flood prevention system, and filling a roadbed; s2, laying the gallery pavement at fixed distance; s3, burying a soil layer monitoring terminal at a fixed depth to monitor a sandy soil change state; s4, an isolation belt is built on the ground of the gallery; s5, the roadbed maintenance state is monitored, and if data abnormity occurs, an alarm is automatically given; and S6, repairing the roadbed. According to the technical scheme, the roadbed maintenance state is monitored in real time by laying the gallery pavement at a fixed distance and burying the monitoring terminal at a fixed depth, an alarm is automatically given if data abnormity is generated, a worker can trim the roadbed in time, construction can be carried out only by blocking the width of one lane at most in the construction and repair process, and the construction efficiency is improved. The influence on surrounding normal traffic or work is avoided to the maximum extent, the road breaking and paving processes are omitted, and the whole construction process and the road closure period are greatly shortened.
本申请提供了一种港池道路建造方法、建造系统及电子设备,该建造方法包括以下步骤:S1:建造港池及防汛体系,并填筑路基;S2:定距敷设廊道路面;S3:定深埋设土层监控终端,以监控砂土变化状态;S4:于廊道地面建造隔离带;S5:监测路基维护状态,若产生数据异常则自动报警;S6:修复路基。本申请技术方案通过定距敷设廊道路面和定深埋设监控终端,实时监测路基维护状态,若产生数据异常则自动报警,工作人员能够及时对路基进行修整,施工修复过程中至多只要封锁一个车道的宽度进行施工,最大程度上避免了对周边正常交通或工作的影响,且省去了破路和铺路的过程,整个施工过程和封路的周期均得以大大缩短。
Harbor basin road construction method, harbor basin road construction system and electronic equipment
一种港池道路建造方法、建造系统及电子设备
SHI JUN (author) / NING JINGJING (author) / JI XIAOTAO (author) / ZHANG JIAHAO (author)
2024-07-12
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E02D
FOUNDATIONS
,
Gründungen
/
G01B
MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS
,
Messen der Länge, der Dicke oder ähnlicher linearer Abmessungen
/
G01C
Messen von Entfernungen, Höhen, Neigungen oder Richtungen
,
MEASURING DISTANCES, LEVELS OR BEARINGS
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
Composite harbor basin and harbor basin arrangement method
European Patent Office | 2020
|Weathered rock excavation construction process in inland river harbor basin
European Patent Office | 2021
|