Panel mounting construction method for roof of skirt house with tower buildings on periphery
The invention discloses a panel mounting method for a roof of a skirt house with towers arranged on the periphery, which comprises the following steps: (1) firstly, erecting a crane on a building roof beside one side of a roof glass curtain wall or a metal curtain wall to be mounted, placing the crane in a range of 2-4 meters away from the edge of the roof, and operating a brake locking disc to brake and fix the crane; (2) arranging a tie plate on a parapet wall on the other side of the to-be-mounted roof glass curtain wall or metal curtain wall, and mounting a strut on a supporting truss which is erected from the ground and is used for supporting a roof main body steel structure on the other side of the to-be-mounted roof main body steel structure; tying steel wire ropes are respectively arranged on two sides of the top of the supporting column, the tying plate and a top cross beam of the other supporting truss, and are tied and fastened; and (3) operating an operating handle of the crane, releasing a crane hoisting steel wire rope, connecting the crane hoisting steel wire rope with the top of the support column, hanging a pulley on the crane hoisting steel wire rope on one side close to the crane, hanging an upper hook of a chain block on the lower end of the pulley, and tightening the crane hoisting steel wire rope by operating the operating handle of the crane.
本发明公开了一种周围设有塔楼的裙房屋面的面板安装工法,①首先在待安装屋面玻璃幕墙或金属幕墙一侧旁边的建筑屋面上架设吊机,吊机放置在距离屋面边缘2‑4米范围,操作刹车抱死盘将吊机刹车固定;②在待安装屋面玻璃幕墙或金属幕墙另一侧的女儿墙上设置拉结板,同时在另一侧待安装屋面主体钢结构自地面架设的支撑屋面主体结构钢结构的支撑行架上面安装支柱,在支柱顶部的两侧分别与拉结板、另一个支撑行架顶部横梁安装拉结钢丝绳,并拉结紧固;③操作吊机的操作把手,把吊机吊装钢丝绳放绳,与支柱顶部连接,在靠近吊机一侧将滑车挂在吊机吊装钢丝绳上,再把手拉葫芦的上挂钩挂在滑车下端,操作吊机的操作把将吊机吊装钢丝绳收紧。
Panel mounting construction method for roof of skirt house with tower buildings on periphery
The invention discloses a panel mounting method for a roof of a skirt house with towers arranged on the periphery, which comprises the following steps: (1) firstly, erecting a crane on a building roof beside one side of a roof glass curtain wall or a metal curtain wall to be mounted, placing the crane in a range of 2-4 meters away from the edge of the roof, and operating a brake locking disc to brake and fix the crane; (2) arranging a tie plate on a parapet wall on the other side of the to-be-mounted roof glass curtain wall or metal curtain wall, and mounting a strut on a supporting truss which is erected from the ground and is used for supporting a roof main body steel structure on the other side of the to-be-mounted roof main body steel structure; tying steel wire ropes are respectively arranged on two sides of the top of the supporting column, the tying plate and a top cross beam of the other supporting truss, and are tied and fastened; and (3) operating an operating handle of the crane, releasing a crane hoisting steel wire rope, connecting the crane hoisting steel wire rope with the top of the support column, hanging a pulley on the crane hoisting steel wire rope on one side close to the crane, hanging an upper hook of a chain block on the lower end of the pulley, and tightening the crane hoisting steel wire rope by operating the operating handle of the crane.
本发明公开了一种周围设有塔楼的裙房屋面的面板安装工法,①首先在待安装屋面玻璃幕墙或金属幕墙一侧旁边的建筑屋面上架设吊机,吊机放置在距离屋面边缘2‑4米范围,操作刹车抱死盘将吊机刹车固定;②在待安装屋面玻璃幕墙或金属幕墙另一侧的女儿墙上设置拉结板,同时在另一侧待安装屋面主体钢结构自地面架设的支撑屋面主体结构钢结构的支撑行架上面安装支柱,在支柱顶部的两侧分别与拉结板、另一个支撑行架顶部横梁安装拉结钢丝绳,并拉结紧固;③操作吊机的操作把手,把吊机吊装钢丝绳放绳,与支柱顶部连接,在靠近吊机一侧将滑车挂在吊机吊装钢丝绳上,再把手拉葫芦的上挂钩挂在滑车下端,操作吊机的操作把将吊机吊装钢丝绳收紧。
Panel mounting construction method for roof of skirt house with tower buildings on periphery
周围设有塔楼的裙房屋面的面板安装工法
LIU AIDONG (author) / LI JIAN (author) / LIU SHIFENG (author)
2024-07-12
Patent
Electronic Resource
Chinese
High-rise building skirt glass lighting roof mounting method
European Patent Office | 2021
|Roof distributed photovoltaic panel mounting structure and construction method thereof