High-rise building skirt glass lighting roof mounting method
The invention provides a high-rise building skirt glass lighting roof mounting method, relates to the field of building construction, aims to solve the problems that a lighting roof may not be hoisted by using a tower crane, the construction efficiency is low and the safety risk is high. The mounting method comprises the following steps of hoisting steel columns and side beams to be mounted to a stacking area near the roof by using the tower crane; hoisting the steel columns from the stacking area to a mounting point for mounting; carrying out boundary beam installation; mounting a main beam; hoisting the beam body in the range by using the tower crane; for out-of-range beam bodies, arranging displacement devices on two opposite side beams within the range of the tower crane, and using a tractor to drive a sliding dragging plate to slide to the mounting position of the sliding dragging plate for mounting so as to enable the out-of-range beam bodies are mounted on the side beams; and mounting a secondary beam. The mounting method has the beneficial effects that the construction efficiency is high, the labor intensity is low, a support does not need to be erected, safety risks are reduced, and economic benefits are good.
本发明涉及建筑施工领域,旨在解决采光屋面可能无法利用塔吊进行吊装,施工效率低及安全风险大的问题,提供一种高层建筑裙楼玻璃采光屋面安装方法,其包括以下步骤:采用塔吊将待安装的钢柱和边梁吊运至屋面附近的堆放区;将钢柱从堆放区吊装至安装点进行安装;进行边梁安装;主梁安装;对于范围内梁体,用塔吊吊装;对于范围外梁体,先在塔吊范围内的两相对边梁上设置移位装置,使用所述牵引器带动滑动拖板滑动到其安装位置进行安装,使各范围外梁体安装于边梁上;次梁安装。本发明的有益效果是施工效率高、劳动强度低,无需搭设支架,降低安全风险,经济效益好的有益效果。
High-rise building skirt glass lighting roof mounting method
The invention provides a high-rise building skirt glass lighting roof mounting method, relates to the field of building construction, aims to solve the problems that a lighting roof may not be hoisted by using a tower crane, the construction efficiency is low and the safety risk is high. The mounting method comprises the following steps of hoisting steel columns and side beams to be mounted to a stacking area near the roof by using the tower crane; hoisting the steel columns from the stacking area to a mounting point for mounting; carrying out boundary beam installation; mounting a main beam; hoisting the beam body in the range by using the tower crane; for out-of-range beam bodies, arranging displacement devices on two opposite side beams within the range of the tower crane, and using a tractor to drive a sliding dragging plate to slide to the mounting position of the sliding dragging plate for mounting so as to enable the out-of-range beam bodies are mounted on the side beams; and mounting a secondary beam. The mounting method has the beneficial effects that the construction efficiency is high, the labor intensity is low, a support does not need to be erected, safety risks are reduced, and economic benefits are good.
本发明涉及建筑施工领域,旨在解决采光屋面可能无法利用塔吊进行吊装,施工效率低及安全风险大的问题,提供一种高层建筑裙楼玻璃采光屋面安装方法,其包括以下步骤:采用塔吊将待安装的钢柱和边梁吊运至屋面附近的堆放区;将钢柱从堆放区吊装至安装点进行安装;进行边梁安装;主梁安装;对于范围内梁体,用塔吊吊装;对于范围外梁体,先在塔吊范围内的两相对边梁上设置移位装置,使用所述牵引器带动滑动拖板滑动到其安装位置进行安装,使各范围外梁体安装于边梁上;次梁安装。本发明的有益效果是施工效率高、劳动强度低,无需搭设支架,降低安全风险,经济效益好的有益效果。
High-rise building skirt glass lighting roof mounting method
一种高层建筑裙楼玻璃采光屋面安装方法
YE XIAOBIN (author) / YAO PING (author)
2021-04-27
Patent
Electronic Resource
Chinese
Panel mounting construction method for roof of skirt house with tower buildings on periphery
European Patent Office | 2024
|Modularized batten quick mounting and anti-falling locking device for high-rise building roof
European Patent Office | 2024
|