Construction method for additionally arranging floor type air conditioner steel frame platform on multi-story building
The invention discloses a construction method for additionally arranging a floor type air conditioner steel frame platform on a multi-story building. The construction method comprises the following steps that S1, an air conditioner outer steel frame foundation is manufactured; s2, 1 #, 2 # and 3 # steel frame platform components are prefabricated in a factory; s3, site construction preparation; s4, the remaining 1 #, 2 # and 3 # steel frameworks are fixedly connected; according to the air conditioner outer steel framework, through the factory-like prefabrication field assembly technology, the material cutting machining, assembling, welding and spraying processes are completed in a factory, and only simple bolt mechanical connection is needed on site. Complicated node position and node structure welding on a construction site is avoided, the construction quality can be effectively prevented from being affected by the complex environment on the site, the construction quality and the construction efficiency are effectively improved, meanwhile, the occupation of the site in a small area in urban updating can be avoided, the potential safety hazard of high-altitude operation is reduced, and noise pollution, dust pollution and water pollution are reduced. The construction period is shortened and the construction cost is reduced.
本发明公开一种多层建筑增设落地式空调钢架平台施工方法,包括如下步骤:S1、空调外钢架基础制作;S2、工厂预制1#、2#、3#钢架平台部件;S3、现场施工准备;S4、将剩余1#、2#、3#钢骨架连接固定;S5、空调外钢骨架成品验收,本发明空调外钢骨架通过工厂化预制现场组装技术,将材料切割加工、组装、焊接、喷涂工艺在工厂内完成,现场只需要通过简单螺栓机械连接即可。施工现场避免进行复杂的节点位置和节点构造焊接,可有效避免施工质量受现场复杂环境的影响,在有效提高施工质量、施工效率的同时,能避免占用城市更新中小区内场地,减少高空作业安全隐患,减少噪声污染、粉尘污染、水污染,缩短施工工期,降低施工成本。
Construction method for additionally arranging floor type air conditioner steel frame platform on multi-story building
The invention discloses a construction method for additionally arranging a floor type air conditioner steel frame platform on a multi-story building. The construction method comprises the following steps that S1, an air conditioner outer steel frame foundation is manufactured; s2, 1 #, 2 # and 3 # steel frame platform components are prefabricated in a factory; s3, site construction preparation; s4, the remaining 1 #, 2 # and 3 # steel frameworks are fixedly connected; according to the air conditioner outer steel framework, through the factory-like prefabrication field assembly technology, the material cutting machining, assembling, welding and spraying processes are completed in a factory, and only simple bolt mechanical connection is needed on site. Complicated node position and node structure welding on a construction site is avoided, the construction quality can be effectively prevented from being affected by the complex environment on the site, the construction quality and the construction efficiency are effectively improved, meanwhile, the occupation of the site in a small area in urban updating can be avoided, the potential safety hazard of high-altitude operation is reduced, and noise pollution, dust pollution and water pollution are reduced. The construction period is shortened and the construction cost is reduced.
本发明公开一种多层建筑增设落地式空调钢架平台施工方法,包括如下步骤:S1、空调外钢架基础制作;S2、工厂预制1#、2#、3#钢架平台部件;S3、现场施工准备;S4、将剩余1#、2#、3#钢骨架连接固定;S5、空调外钢骨架成品验收,本发明空调外钢骨架通过工厂化预制现场组装技术,将材料切割加工、组装、焊接、喷涂工艺在工厂内完成,现场只需要通过简单螺栓机械连接即可。施工现场避免进行复杂的节点位置和节点构造焊接,可有效避免施工质量受现场复杂环境的影响,在有效提高施工质量、施工效率的同时,能避免占用城市更新中小区内场地,减少高空作业安全隐患,减少噪声污染、粉尘污染、水污染,缩短施工工期,降低施工成本。
Construction method for additionally arranging floor type air conditioner steel frame platform on multi-story building
一种多层建筑增设落地式空调钢架平台施工方法
LIANG JIAFENG (author) / WANG GUANGWEI (author) / ZHAO KUIFU (author) / XU YANG (author) / ZHANG YONGXU (author) / CHEN XIAOWEN (author)
2024-07-16
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2021
|European Patent Office | 2023
|Precast concrete module hoistway for additionally arranging elevator and construction method
European Patent Office | 2021
|European Patent Office | 2023
|Method for additionally arranging fulcrum column under beam
European Patent Office | 2022
|