A platform for research: civil engineering, architecture and urbanism
Construction method facilitating installation of multi-point supporting tower type structure
The invention discloses a construction method convenient for mounting a multi-point support tower structure, which comprises the following steps of: (1) plane design: firstly, measuring data at a site needing to be mounted according to design requirements, then designing a three-dimensional model by using design software according to the acquired data, and adjusting various parameters, therefore, construction parameters of each construction node are obtained; (2) preparation of a firstly, excavating a foundation pit after a foundation position is measured in advance; by adopting the construction method designed by the equipment, the multi-point support tower type structure can be firmly mounted, and sectional mounting and fixing can be performed in the assembly process, so that the phenomenon that the hoisted structure is bent and distorted due to overweight during hoisting can be avoided, and the hoisting efficiency is improved. Therefore, the stability of the multi-point supporting tower frame type structure is guaranteed, and the installation quality of the multi-point supporting tower frame type structure is guaranteed.
本发明公开了一种便于多点支撑塔架式结构安装的施工方法,包括如下步骤:(一)平面设计:首先根据设计需要在需要安装的现场进行数据的测量,然后通过将采集到的数据利用设计软件进行三维模型的设计及对各项参数进行调节,从而来得到各个施工节点的施工参数;(二)基座的制备:首先在事先测量好的地基位置后将基坑进行挖掘。通过采用本设备设计的施工方法,能够使多点支撑塔架式结构进行牢固的安装,且能够在装配的过程中进行分段式的安装固定,从而能够保证在吊装的时候不会出现因为重量过重的导致被吊装的结构出现弯折扭曲的现象,从而保证了该多点支撑塔架式结构的稳定性,保证了多点支撑塔架式结构的安装质量。
Construction method facilitating installation of multi-point supporting tower type structure
The invention discloses a construction method convenient for mounting a multi-point support tower structure, which comprises the following steps of: (1) plane design: firstly, measuring data at a site needing to be mounted according to design requirements, then designing a three-dimensional model by using design software according to the acquired data, and adjusting various parameters, therefore, construction parameters of each construction node are obtained; (2) preparation of a firstly, excavating a foundation pit after a foundation position is measured in advance; by adopting the construction method designed by the equipment, the multi-point support tower type structure can be firmly mounted, and sectional mounting and fixing can be performed in the assembly process, so that the phenomenon that the hoisted structure is bent and distorted due to overweight during hoisting can be avoided, and the hoisting efficiency is improved. Therefore, the stability of the multi-point supporting tower frame type structure is guaranteed, and the installation quality of the multi-point supporting tower frame type structure is guaranteed.
本发明公开了一种便于多点支撑塔架式结构安装的施工方法,包括如下步骤:(一)平面设计:首先根据设计需要在需要安装的现场进行数据的测量,然后通过将采集到的数据利用设计软件进行三维模型的设计及对各项参数进行调节,从而来得到各个施工节点的施工参数;(二)基座的制备:首先在事先测量好的地基位置后将基坑进行挖掘。通过采用本设备设计的施工方法,能够使多点支撑塔架式结构进行牢固的安装,且能够在装配的过程中进行分段式的安装固定,从而能够保证在吊装的时候不会出现因为重量过重的导致被吊装的结构出现弯折扭曲的现象,从而保证了该多点支撑塔架式结构的稳定性,保证了多点支撑塔架式结构的安装质量。
Construction method facilitating installation of multi-point supporting tower type structure
一种便于多点支撑塔架式结构安装的施工方法
WANG JIN (author) / ZHAO HONGMIN (author) / LYU ZHONGLIANG (author) / ZHANG CHI (author)
2024-07-26
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Communication tower facilitating component installation and maintenance
European Patent Office | 2021
|European Patent Office | 2024
|European Patent Office | 2022
|Installation and construction method for German tower with high formwork supporting frame
European Patent Office | 2022
|