Bridge erecting machine equipment and construction method thereof
The invention discloses bridge girder erection machine equipment and a construction method thereof.The bridge girder erection machine equipment comprises a main beam, a front supporting leg, a front auxiliary supporting leg, a middle supporting leg and a rear supporting leg are sequentially arranged on the main beam, the rear supporting leg and the front supporting leg are arranged at the two ends of the main beam respectively, a bridge deck is arranged below the main beam, the rear supporting leg and the middle supporting leg are both arranged on the bridge deck, pier columns are sequentially arranged on the side of the bridge deck, and steel buttresses are arranged on the pier columns; the steel buttress is connected with a transverse adjusting device; by the adoption of the bridge girder erection machine equipment and the construction method of the bridge girder erection machine equipment, the requirement for installation of the steel cover beam and the box beam can be met, operation is convenient, and efficiency is high.
本发明公开了一种架桥机设备及其施工方法,包括主梁,主梁上依次设有前支腿、前辅助支腿、中支腿、后支腿,后支腿和前支腿分别设在主梁两端,主梁下方设有桥面,后支腿和中支腿均设在桥面上,桥面侧方依次设有墩柱,墩柱上设有钢支墩,钢支墩连接有横向调节装置;主梁上端设有天车,天车连接有旋转吊架,采用本发明的架桥机设备及其施工方法,可满足钢盖梁和箱梁的安装,操作方便,效率高。
Bridge erecting machine equipment and construction method thereof
The invention discloses bridge girder erection machine equipment and a construction method thereof.The bridge girder erection machine equipment comprises a main beam, a front supporting leg, a front auxiliary supporting leg, a middle supporting leg and a rear supporting leg are sequentially arranged on the main beam, the rear supporting leg and the front supporting leg are arranged at the two ends of the main beam respectively, a bridge deck is arranged below the main beam, the rear supporting leg and the middle supporting leg are both arranged on the bridge deck, pier columns are sequentially arranged on the side of the bridge deck, and steel buttresses are arranged on the pier columns; the steel buttress is connected with a transverse adjusting device; by the adoption of the bridge girder erection machine equipment and the construction method of the bridge girder erection machine equipment, the requirement for installation of the steel cover beam and the box beam can be met, operation is convenient, and efficiency is high.
本发明公开了一种架桥机设备及其施工方法,包括主梁,主梁上依次设有前支腿、前辅助支腿、中支腿、后支腿,后支腿和前支腿分别设在主梁两端,主梁下方设有桥面,后支腿和中支腿均设在桥面上,桥面侧方依次设有墩柱,墩柱上设有钢支墩,钢支墩连接有横向调节装置;主梁上端设有天车,天车连接有旋转吊架,采用本发明的架桥机设备及其施工方法,可满足钢盖梁和箱梁的安装,操作方便,效率高。
Bridge erecting machine equipment and construction method thereof
一种架桥机设备及其施工方法
XU KUI (author) / ZENG LIWEN (author) / LONG XIANG (author) / CHEN JINGSONG (author) / PANG LIGUO (author) / TAN XIAOFENG (author) / WANG YU (author) / LI JIAMING (author) / CHEN FULEI (author) / ZHU ZHIXIANG (author)
2024-08-06
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Multifunctional bridge erecting machine and bridge erecting construction method
European Patent Office | 2022
|Bridge erecting machine for road and bridge erecting construction
European Patent Office | 2024
|Bridge erecting machine and method for full-prefabricated bridge erecting construction
European Patent Office | 2020
|Bridge erecting method and bridge erecting machine for realizing the bridge erecting method
European Patent Office | 2020
|