A platform for research: civil engineering, architecture and urbanism
Subgrade settlement control device for complex foundation deformation section
A subgrade settlement control device for a complex foundation deformation section belongs to the technical field of subgrade construction and comprises a settlement rod, a settlement plate is mounted at the bottom end of the settlement rod, the settlement plate and the settlement rod are vertically arranged, the outer surface of the settlement rod is sleeved with an approval sleeve, and depth marks are arranged on the side, close to the settlement plate, of the approval sleeve from bottom to top. A fixing plate is fixedly installed on the side, away from the settlement plate, of the approval sleeve, the fixing plate is arranged in parallel and parallel to the depth mark, a plurality of steel chisels are symmetrically and fixedly installed on the side, close to the approval sleeve, of the fixing plate, and a supporting frame A and a supporting frame B are fixedly installed on the outer surface of the end, away from the settlement plate, of the approval sleeve; and a solar cell panel is fixedly mounted on the support frame A, and a remote settlement monitoring device is fixedly mounted on the support frame B. According to the invention, during compaction operation after subgrade layered filling and subgrade settlement in the future, the probability of deviation of a settlement rod and an approval sleeve is reduced, so that a certain error during reading is avoided, and the judgment accuracy is ensured.
一种复杂基础变形区段路基沉降控制装置,所属路基施工技术领域,包括沉降杆,沉降杆的底端安装有沉降板,沉降板与沉降杆之间垂直设置,且沉降杆的外表面套设有核准套管,核准套管靠近沉降板的一侧从下至上设置有深度标识,核准套管背离沉降板的一侧固定安装有固定板,固定板平行设置与深度标识平行设置,且固定板靠近核准套管的一侧对称固定安装有多个钢钎,核准套管远离沉降板的一端外表面固定安装有支撑架A和支撑架B,支撑架A上固定安装有太阳能电池板,支撑架B上固定安装有远程沉降监控装置,本发明在在路基分层填筑后的压实作业及日后路基沉降时,降低沉降杆和核准套管发生偏移的概率,从而避免读数时存在一定误差,保证判断精准性。
Subgrade settlement control device for complex foundation deformation section
A subgrade settlement control device for a complex foundation deformation section belongs to the technical field of subgrade construction and comprises a settlement rod, a settlement plate is mounted at the bottom end of the settlement rod, the settlement plate and the settlement rod are vertically arranged, the outer surface of the settlement rod is sleeved with an approval sleeve, and depth marks are arranged on the side, close to the settlement plate, of the approval sleeve from bottom to top. A fixing plate is fixedly installed on the side, away from the settlement plate, of the approval sleeve, the fixing plate is arranged in parallel and parallel to the depth mark, a plurality of steel chisels are symmetrically and fixedly installed on the side, close to the approval sleeve, of the fixing plate, and a supporting frame A and a supporting frame B are fixedly installed on the outer surface of the end, away from the settlement plate, of the approval sleeve; and a solar cell panel is fixedly mounted on the support frame A, and a remote settlement monitoring device is fixedly mounted on the support frame B. According to the invention, during compaction operation after subgrade layered filling and subgrade settlement in the future, the probability of deviation of a settlement rod and an approval sleeve is reduced, so that a certain error during reading is avoided, and the judgment accuracy is ensured.
一种复杂基础变形区段路基沉降控制装置,所属路基施工技术领域,包括沉降杆,沉降杆的底端安装有沉降板,沉降板与沉降杆之间垂直设置,且沉降杆的外表面套设有核准套管,核准套管靠近沉降板的一侧从下至上设置有深度标识,核准套管背离沉降板的一侧固定安装有固定板,固定板平行设置与深度标识平行设置,且固定板靠近核准套管的一侧对称固定安装有多个钢钎,核准套管远离沉降板的一端外表面固定安装有支撑架A和支撑架B,支撑架A上固定安装有太阳能电池板,支撑架B上固定安装有远程沉降监控装置,本发明在在路基分层填筑后的压实作业及日后路基沉降时,降低沉降杆和核准套管发生偏移的概率,从而避免读数时存在一定误差,保证判断精准性。
Subgrade settlement control device for complex foundation deformation section
一种复杂基础变形区段路基沉降控制装置
WANG LEI (author) / SHU CHENGXING (author) / TIAN JINGJING (author) / LI YANLONG (author) / LIU BO (author) / WAN CHUNGUANG (author) / WANG ZIHANG (author) / WEN BINGYIN (author)
2024-08-20
Patent
Electronic Resource
Chinese
Monitoring device for deformation and settlement of road subgrade
European Patent Office | 2024
|Settlement Analysis for Embedded Foundation Resting on Non-Homogeneous Subgrade
Trans Tech Publications | 2013
|Settlement Analysis for Embedded Foundation Resting on Non-Homogeneous Subgrade
British Library Conference Proceedings | 2013
|