A platform for research: civil engineering, architecture and urbanism
Highway subgrade anti-settlement device
The invention relates to the technical field of subgrade anti-settlement devices, in particular to a highway subgrade anti-settlement device which comprises a subgrade body, permeable layers are symmetrically arranged on the two sides of the subgrade body, and water collecting grooves are fixedly connected to the sides, away from the subgrade body, of the permeable layers. Fixing plates are symmetrically arranged on the outer walls of the top ends of the two sides of the foundation pile body, fixing piles are fixedly connected to the bottoms of the fixing plates, and limiting assemblies are arranged in the foundation pile body. The position of the foundation pile body is limited through the limiting assembly, the overall stability and stability of a roadbed are improved, the displacement is adjusted through matched use of the rotating assembly and the drainage hole, the phenomenon that the roadbed is broken and fractured in the use process is avoided, and it is guaranteed that the service life of the roadbed is not affected.
本发明涉及路基防沉降装置技术领域,具体是一种公路路基防沉降装置,本发明包括路基主体,路基主体两侧对称设有透水层,透水层远离路基主体的一侧固定连接有集水槽,路基主体的内部两端对称基桩主体,基桩主体两侧顶端外壁上对称设有固定板,固定板底部固定连接有固定桩,基桩主体的内部设有限位组件;本发明是通过限位组件对基桩主体位置进行限位,提高路基的整体稳定性和稳固性,还通过转动组件和排水孔的配合使用调整排水量,避免在使用过程中路基出现折断破裂的现象,保证路基的使用寿命不受影响。
Highway subgrade anti-settlement device
The invention relates to the technical field of subgrade anti-settlement devices, in particular to a highway subgrade anti-settlement device which comprises a subgrade body, permeable layers are symmetrically arranged on the two sides of the subgrade body, and water collecting grooves are fixedly connected to the sides, away from the subgrade body, of the permeable layers. Fixing plates are symmetrically arranged on the outer walls of the top ends of the two sides of the foundation pile body, fixing piles are fixedly connected to the bottoms of the fixing plates, and limiting assemblies are arranged in the foundation pile body. The position of the foundation pile body is limited through the limiting assembly, the overall stability and stability of a roadbed are improved, the displacement is adjusted through matched use of the rotating assembly and the drainage hole, the phenomenon that the roadbed is broken and fractured in the use process is avoided, and it is guaranteed that the service life of the roadbed is not affected.
本发明涉及路基防沉降装置技术领域,具体是一种公路路基防沉降装置,本发明包括路基主体,路基主体两侧对称设有透水层,透水层远离路基主体的一侧固定连接有集水槽,路基主体的内部两端对称基桩主体,基桩主体两侧顶端外壁上对称设有固定板,固定板底部固定连接有固定桩,基桩主体的内部设有限位组件;本发明是通过限位组件对基桩主体位置进行限位,提高路基的整体稳定性和稳固性,还通过转动组件和排水孔的配合使用调整排水量,避免在使用过程中路基出现折断破裂的现象,保证路基的使用寿命不受影响。
Highway subgrade anti-settlement device
一种公路路基防沉降装置
WANG BIN (author) / GONG MAOLIN (author) / DU HUA (author) / SHI XIAO (author) / HE CHAOLIANG (author)
2024-09-24
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E03F
SEWERS
,
Abwasserkanäle
Adjustable highway subgrade settlement observation device
European Patent Office | 2023
|Highway subgrade settlement prevention device and method
European Patent Office | 2022
|Anti-settlement highway subgrade reinforcing structure and construction method
European Patent Office | 2020
|