A platform for research: civil engineering, architecture and urbanism
Construction method of full-fabricated concrete multi-story building system
The invention relates to the field of fabricated buildings, in particular to a construction method of a fully fabricated concrete multi-story building system.The fully fabricated concrete multi-story building system comprises a plurality of prefabricated components made of reinforced concrete, and the prefabricated components comprise prefabricated vertical components, prefabricated beams, prefabricated floor slabs and prefabricated caissons; the construction method of each building component comprises the construction steps that the prefabricated vertical components, the prefabricated beams and the prefabricated floor slabs are installed, when the prefabricated beams and the prefabricated floor slabs are installed, the prefabricated beams or the prefabricated floor slabs are hoisted so that the two ends of the prefabricated beams or the prefabricated floor slabs can be located on the corresponding adjustable supporting devices respectively, and the heights of the prefabricated beams and the prefabricated floor slabs can be adjusted by adjusting the adjustable supporting devices. By implementing the scheme, the problem that an existing building system is long in construction period is solved.
本发明涉及装配式建筑领域,具体涉及一种全装配式混凝土多层建筑体系的施工方法,包括由钢筋混凝土制成的多个预制构件,所述预制构件包括预制竖向构件、预制梁、预制楼板、预制沉箱,各建筑构件的施工步骤包括:预制竖向构件的安装、预制梁的安装、预制楼板的安装,其中预制梁和预制楼板在安装时,吊装预制梁或预制楼板使其两端分别位于对应的可调式支撑装置上,并通过调节可调节式支撑装置来调整两者的高度。通过实施本方案,以解决现有建筑体系施工工期长的问题。
Construction method of full-fabricated concrete multi-story building system
The invention relates to the field of fabricated buildings, in particular to a construction method of a fully fabricated concrete multi-story building system.The fully fabricated concrete multi-story building system comprises a plurality of prefabricated components made of reinforced concrete, and the prefabricated components comprise prefabricated vertical components, prefabricated beams, prefabricated floor slabs and prefabricated caissons; the construction method of each building component comprises the construction steps that the prefabricated vertical components, the prefabricated beams and the prefabricated floor slabs are installed, when the prefabricated beams and the prefabricated floor slabs are installed, the prefabricated beams or the prefabricated floor slabs are hoisted so that the two ends of the prefabricated beams or the prefabricated floor slabs can be located on the corresponding adjustable supporting devices respectively, and the heights of the prefabricated beams and the prefabricated floor slabs can be adjusted by adjusting the adjustable supporting devices. By implementing the scheme, the problem that an existing building system is long in construction period is solved.
本发明涉及装配式建筑领域,具体涉及一种全装配式混凝土多层建筑体系的施工方法,包括由钢筋混凝土制成的多个预制构件,所述预制构件包括预制竖向构件、预制梁、预制楼板、预制沉箱,各建筑构件的施工步骤包括:预制竖向构件的安装、预制梁的安装、预制楼板的安装,其中预制梁和预制楼板在安装时,吊装预制梁或预制楼板使其两端分别位于对应的可调式支撑装置上,并通过调节可调节式支撑装置来调整两者的高度。通过实施本方案,以解决现有建筑体系施工工期长的问题。
Construction method of full-fabricated concrete multi-story building system
一种全装配式混凝土多层建筑体系的施工方法
CHENG SHUAI (author) / YUAN CHANGYONG (author) / LI XIAQIU (author) / CHEN SHENG (author)
2024-08-30
Patent
Electronic Resource
Chinese
Construction method of full-fabricated concrete building system
European Patent Office | 2021
|Fabricated building process full-interpenetration construction method
European Patent Office | 2022
|Steel-frame and reinforced-concrete multi-story building construction
Engineering Index Backfile | 1930
|