A platform for research: civil engineering, architecture and urbanism
Construction method for treating frozen soil roadbed through partition layer
The invention discloses a construction method for treating a frozen soil roadbed through a partition layer, and the construction method comprises the steps of field investigation operation, material selection and preparation operation, construction equipment preparation operation, partition layer construction operation, construction quality control operation and post-construction maintenance management operation. According to the construction method, the partition layer is arranged, so that water in foundation soil and freezing of the upper portion of the roadbed are effectively isolated, the influence of the frost heaving effect on the roadbed is reduced, and the construction quality of the roadbed is improved. The partition layer treatment technology can enhance the anti-freezing performance of the roadbed, improve the stability of the road and reduce accidents such as landslide and collapse, the frozen soil roadbed is treated through the partition layer, pavement diseases can be effectively prevented and repaired, the service life of the road is prolonged, and the overall cost for maintaining the frozen soil roadbed per kilometer is reduced.
本发明公开了一种隔断层处理冻土路基的施工方法,包括现场调查作业、材料选择和准备作业、施工设备准备作业、隔断层施工作业、施工质量控制作业和施工后维护管理作业,所述现场调查作业在进行冻土路基处理之前,对现场进行详细的调查与评估,进行数据记录,调查路基的地质条件,了解冻土的分布范围,本施工方法通过设置隔断层,有效地隔断了地基土中的水分与上部路基的冻结,减少了冻胀作用对路基的影响,隔断层处理技术能够增强路基的抗冻性能,提高道路的稳定性,减少滑坡、塌陷等事故的发生,通过隔断层处理冻土路基,能够有效预防和修复路面病害,延长道路的使用寿命,降低维护冻土路基公里的整体成本。
Construction method for treating frozen soil roadbed through partition layer
The invention discloses a construction method for treating a frozen soil roadbed through a partition layer, and the construction method comprises the steps of field investigation operation, material selection and preparation operation, construction equipment preparation operation, partition layer construction operation, construction quality control operation and post-construction maintenance management operation. According to the construction method, the partition layer is arranged, so that water in foundation soil and freezing of the upper portion of the roadbed are effectively isolated, the influence of the frost heaving effect on the roadbed is reduced, and the construction quality of the roadbed is improved. The partition layer treatment technology can enhance the anti-freezing performance of the roadbed, improve the stability of the road and reduce accidents such as landslide and collapse, the frozen soil roadbed is treated through the partition layer, pavement diseases can be effectively prevented and repaired, the service life of the road is prolonged, and the overall cost for maintaining the frozen soil roadbed per kilometer is reduced.
本发明公开了一种隔断层处理冻土路基的施工方法,包括现场调查作业、材料选择和准备作业、施工设备准备作业、隔断层施工作业、施工质量控制作业和施工后维护管理作业,所述现场调查作业在进行冻土路基处理之前,对现场进行详细的调查与评估,进行数据记录,调查路基的地质条件,了解冻土的分布范围,本施工方法通过设置隔断层,有效地隔断了地基土中的水分与上部路基的冻结,减少了冻胀作用对路基的影响,隔断层处理技术能够增强路基的抗冻性能,提高道路的稳定性,减少滑坡、塌陷等事故的发生,通过隔断层处理冻土路基,能够有效预防和修复路面病害,延长道路的使用寿命,降低维护冻土路基公里的整体成本。
Construction method for treating frozen soil roadbed through partition layer
一种隔断层处理冻土路基的施工方法
QIN CHANGBING (author) / SUN HAIXIU (author) / ZHANG XUJUN (author) / BAI SHUXUAN (author) / XU YINDONG (author) / FU HUA (author) / WANG GUOJIAN (author) / HAN JIAQING (author) / YANG WENYU (author)
2024-09-03
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Foam concrete construction device for frozen soil roadbed
European Patent Office | 2024
|Frozen soil roadbed corrugated steel pipe cooling construction method
European Patent Office | 2020
|Roadbed structure in frozen soil area and construction method
European Patent Office | 2023
|High-cold roadbed frozen soil heat insulation construction method
European Patent Office | 2016
|Frozen soil roadbed side ditch structure and construction method
European Patent Office | 2024
|