A platform for research: civil engineering, architecture and urbanism
Construction method of adjustable trolley formwork
According to the construction method of the adjustable trolley formwork, the problems that an existing trolley formwork is poor in formwork system adjusting capacity, and a supporting frame body cannot be adjusted and is inconvenient to move are solved. The method comprises the steps that an adjustable trolley formwork is arranged on the first construction section of a box culvert structure to be poured, a wall face supporting elevator extends and is supported on a wall of the poured box culvert structure, a bottom elevator extends to jack a formwork jacking assembly to the designed height, and an angle formwork elevator extends to push an angle formwork panel to be spliced with the formwork jacking assembly; the side formwork lifting machine extends to push the side formwork assembly to stretch out and be spliced with the angle formwork panel; after construction of the current construction section is completed, the wall face supporting lifters are controlled to contract, the side formwork lifters, the corner formwork lifters and the bottom lifters are controlled to contract in sequence, the rollers of the supporting frame bodies are supported on the walking devices, the bottom lifters are controlled to contract, and the formwork system after formwork removal moves to the next construction section of the box culvert structure to be poured along with the walking devices; and the steps are repeated until concrete pouring construction of the box culvert structure to be poured is completed section by section.
本发明的一种可调台车模架的施工方法,针对现有台车模架存在模板系统调节能力差,支撑架体不可调且移动不便的问题。步骤:将可调台车模架置于拟浇筑箱涵结构的首个施工段,墙面支撑升降机伸长并支撑于已浇筑箱涵结构墙体,底部升降机伸长顶升顶模组件至设计高度,角模升降机伸长推动角模面板与顶模组件拼合,侧模升降机伸长推动侧模组件伸出并与角模面板拼合;当前施工段施工完成后,控制墙面支撑升降机收缩,依次控制侧模升降机、角模升降机、底部升降机收缩,使支撑架体的滚轮支撑于行走装置,控制底部升降机收缩,使得拆模后的模板系统随行走装置移动至拟浇筑箱涵结构的下一施工段,如此反复直至逐段完成拟浇筑箱涵结构的混凝土浇筑施工。
Construction method of adjustable trolley formwork
According to the construction method of the adjustable trolley formwork, the problems that an existing trolley formwork is poor in formwork system adjusting capacity, and a supporting frame body cannot be adjusted and is inconvenient to move are solved. The method comprises the steps that an adjustable trolley formwork is arranged on the first construction section of a box culvert structure to be poured, a wall face supporting elevator extends and is supported on a wall of the poured box culvert structure, a bottom elevator extends to jack a formwork jacking assembly to the designed height, and an angle formwork elevator extends to push an angle formwork panel to be spliced with the formwork jacking assembly; the side formwork lifting machine extends to push the side formwork assembly to stretch out and be spliced with the angle formwork panel; after construction of the current construction section is completed, the wall face supporting lifters are controlled to contract, the side formwork lifters, the corner formwork lifters and the bottom lifters are controlled to contract in sequence, the rollers of the supporting frame bodies are supported on the walking devices, the bottom lifters are controlled to contract, and the formwork system after formwork removal moves to the next construction section of the box culvert structure to be poured along with the walking devices; and the steps are repeated until concrete pouring construction of the box culvert structure to be poured is completed section by section.
本发明的一种可调台车模架的施工方法,针对现有台车模架存在模板系统调节能力差,支撑架体不可调且移动不便的问题。步骤:将可调台车模架置于拟浇筑箱涵结构的首个施工段,墙面支撑升降机伸长并支撑于已浇筑箱涵结构墙体,底部升降机伸长顶升顶模组件至设计高度,角模升降机伸长推动角模面板与顶模组件拼合,侧模升降机伸长推动侧模组件伸出并与角模面板拼合;当前施工段施工完成后,控制墙面支撑升降机收缩,依次控制侧模升降机、角模升降机、底部升降机收缩,使支撑架体的滚轮支撑于行走装置,控制底部升降机收缩,使得拆模后的模板系统随行走装置移动至拟浇筑箱涵结构的下一施工段,如此反复直至逐段完成拟浇筑箱涵结构的混凝土浇筑施工。
Construction method of adjustable trolley formwork
一种可调台车模架的施工方法
WANG BAOCHENG (author) / WU LIANDING (author) / LI XINKUI (author) / CHEN JUN (author) / YUAN JIAXIONG (author) / WANG JIAHUA (author) / MA WEI (author)
2024-09-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E21D
SHAFTS
,
Schächte
Formwork trolley of top longitudinal beam and construction method of formwork trolley
European Patent Office | 2024
|