A platform for research: civil engineering, architecture and urbanism
CA mortar viscosity pouring system and pouring method for ballastless track
The invention relates to a CA mortar viscosity pouring system and method for a ballastless track. The ballastless track comprises a supporting layer (1). A track plate (2) is arranged on the supporting layer (1); a steel rail assembly (4) is mounted on the track plate (2) through a fastener (5); the pouring system at least comprises construction equipment (9) walking on the steel rail assembly (4). CA mortar (3) is poured between the supporting layer (1) and the track plate (2); and a grouting hole (6) is formed in the track plate (2). The device is reasonable in design, compact in structure and convenient to use.
本发明涉及用于无砟轨道的CA砂浆粘度浇筑系统及浇筑方法,无砟轨道包括支撑层(1);在支撑层(1)上设置有轨道板(2);在轨道板(2)上通过扣件(5)安装有钢轨组件(4);浇筑系统至少包括在钢轨组件(4)上行走的施工设备(9);在支撑层(1)与轨道板(2)之间浇筑有CA砂浆(3);在轨道板(2)上设置有注浆孔(6)。本发明设计合理、结构紧凑且使用方便。
CA mortar viscosity pouring system and pouring method for ballastless track
The invention relates to a CA mortar viscosity pouring system and method for a ballastless track. The ballastless track comprises a supporting layer (1). A track plate (2) is arranged on the supporting layer (1); a steel rail assembly (4) is mounted on the track plate (2) through a fastener (5); the pouring system at least comprises construction equipment (9) walking on the steel rail assembly (4). CA mortar (3) is poured between the supporting layer (1) and the track plate (2); and a grouting hole (6) is formed in the track plate (2). The device is reasonable in design, compact in structure and convenient to use.
本发明涉及用于无砟轨道的CA砂浆粘度浇筑系统及浇筑方法,无砟轨道包括支撑层(1);在支撑层(1)上设置有轨道板(2);在轨道板(2)上通过扣件(5)安装有钢轨组件(4);浇筑系统至少包括在钢轨组件(4)上行走的施工设备(9);在支撑层(1)与轨道板(2)之间浇筑有CA砂浆(3);在轨道板(2)上设置有注浆孔(6)。本发明设计合理、结构紧凑且使用方便。
CA mortar viscosity pouring system and pouring method for ballastless track
用于无砟轨道的CA砂浆粘度浇筑系统及浇筑方法
DAI WEIWU (author) / XIE KAIZE (author) / ZHAO JIA (author) / ZHAO ZHENHANG (author) / YANG YONG (author) / TIAN XIUSHU (author) / ZHAO WEIGANG (author)
2024-09-10
Patent
Electronic Resource
Chinese
Pouring mold for ballastless track leveling layer and ballastless track construction method
European Patent Office | 2024
|Pouring device of ballastless track foundation and construction method of pouring device
European Patent Office | 2021
|Self-compacting concrete side face single-side pouring method for ballastless track
European Patent Office | 2015
|Concrete pouring device for cast-in-place ballastless track bed construction
European Patent Office | 2020
|