A platform for research: civil engineering, architecture and urbanism
Integrated steel hanging box cofferdam integral system
The invention relates to an integrated steel hanging box cofferdam integral system, which is characterized in that the whole steel hanging box is designed and processed in a factory, and comprises a wall body, a bottom plate, a lifting lug, a fluorescent band for laser positioning, a hanging system and an integral rigidity enhancing system. The steel hanging box cofferdam takes an anti-collision pouring jacket as a main wall body of the steel hanging box; a bottom plate is arranged at the bottom opening of the anti-collision sleeve box and serves as the bottom plate structure of the steel hanging box. The steel hanging box cofferdam is provided with a hanging system and is hung on an upper opening of the steel casing after field installation is completed. The steel hanging box cofferdam is further provided with a rigidity enhancing system to enhance the rigidity and reduce deflection, all the components are installed and machined in a factory at a time, the whole steel hanging box cofferdam is transported to a construction site to be installed, no welding work exists on the hoisting site, the construction speed is high, installation precision is high, construction cost is low, construction efficiency is high, construction danger is low, and the steel hanging box cofferdam is suitable for application and popularization.
本发明涉及一种一体式钢吊箱围堰整体系统,所述钢吊箱整体在工厂设计加工完成,包括壁体,底板,吊耳,激光定位用荧光带,吊挂系统,整体刚度增强系统。钢吊箱围堰借助防撞套箱作为所述钢吊箱的主要壁体;在所述防撞套箱底口设置底板,作为钢吊箱的所述底板结构。所述钢吊箱围堰有吊挂系统,现场安装完成后挂于钢护筒上口。所述钢吊箱围堰还有刚度增强系统来加强自身刚度减小挠度,以上均在工厂一次安装加工完成,整体运至施工现场安装,本发明吊装现场没有任何焊接工作,施工速度快、安装精度高,施工成本低、施工效率高、施工危险性低并适宜推广应用。
Integrated steel hanging box cofferdam integral system
The invention relates to an integrated steel hanging box cofferdam integral system, which is characterized in that the whole steel hanging box is designed and processed in a factory, and comprises a wall body, a bottom plate, a lifting lug, a fluorescent band for laser positioning, a hanging system and an integral rigidity enhancing system. The steel hanging box cofferdam takes an anti-collision pouring jacket as a main wall body of the steel hanging box; a bottom plate is arranged at the bottom opening of the anti-collision sleeve box and serves as the bottom plate structure of the steel hanging box. The steel hanging box cofferdam is provided with a hanging system and is hung on an upper opening of the steel casing after field installation is completed. The steel hanging box cofferdam is further provided with a rigidity enhancing system to enhance the rigidity and reduce deflection, all the components are installed and machined in a factory at a time, the whole steel hanging box cofferdam is transported to a construction site to be installed, no welding work exists on the hoisting site, the construction speed is high, installation precision is high, construction cost is low, construction efficiency is high, construction danger is low, and the steel hanging box cofferdam is suitable for application and popularization.
本发明涉及一种一体式钢吊箱围堰整体系统,所述钢吊箱整体在工厂设计加工完成,包括壁体,底板,吊耳,激光定位用荧光带,吊挂系统,整体刚度增强系统。钢吊箱围堰借助防撞套箱作为所述钢吊箱的主要壁体;在所述防撞套箱底口设置底板,作为钢吊箱的所述底板结构。所述钢吊箱围堰有吊挂系统,现场安装完成后挂于钢护筒上口。所述钢吊箱围堰还有刚度增强系统来加强自身刚度减小挠度,以上均在工厂一次安装加工完成,整体运至施工现场安装,本发明吊装现场没有任何焊接工作,施工速度快、安装精度高,施工成本低、施工效率高、施工危险性低并适宜推广应用。
Integrated steel hanging box cofferdam integral system
一体式钢吊箱围堰整体系统
YANG SHENGFENG (author) / LIU DACHENG (author) / LIU YUSONG (author) / LI KANG (author) / REN CHUJUN (author) / FENG YANPING (author) / WANG ZHIQIANG (author) / GAO ZHIYU (author) / WANG JINGYU (author) / XU LIANGKANG (author)
2024-09-13
Patent
Electronic Resource
Chinese
Hanging box cofferdam and construction method of hanging box cofferdam
European Patent Office | 2024
|Integrated steel hanging box cofferdam installation system and installation method
European Patent Office | 2024
|European Patent Office | 2021
|Steel cofferdam or hanging box launching process design method
European Patent Office | 2015
|