A platform for research: civil engineering, architecture and urbanism
Coal measure stratum mudstone slope system reinforcing method
The invention discloses a coal measure stratum mudstone slope system reinforcing method. The method comprises the four steps of subarea surface drainage, electrochemical drainage, intermittent retaining wall blocking and anchor cable passive traction. According to the method, the side slope is subjected to zoning treatment, and measures are conveniently applied according to the zones; electrochemical drainage is matched with crack filling, so that the purpose of continuously reinforcing the local side slope is achieved, and the previous once and for all treatment concept is changed; a plurality of groups of V-shaped reinforced triangular areas are combined to realize a group column effect, and multi-point force generation realizes linkage treatment; the segmented retaining wall blocks the mutual influence between the upper and lower partitions, realizes the binding between the two adjacent partitions, and provides effective support for the partitions; and the anchor cables are passively dragged to continuously reinforce weak areas and marginal areas, so that the comprehensive system treatment targets of general treatment without dead angles and strengthening of key areas are achieved.
本发明公开了一种煤系地层泥岩边坡系统加固方法,包括分区地表排水、电化学排水、间断挡墙阻隔、锚索被动牵引四个步骤;本发明对边坡进行分区治理,便于因区施策;电化学排水配合裂缝填充,实现持续加固局部边坡的目的,改变以往一劳永逸的治理理念;采用多组V型加固三角区域联合实现群柱效应,多点发力实现联动治理;分段挡墙阻断了上下分区间的相互影响,实现了相邻两个分区间的捆绑,为分区提供了有效支撑;锚索被动牵引持续加固软弱区、边缘区,实现了普遍治理无死角,重点区域可强化的综合系统治理目标。
Coal measure stratum mudstone slope system reinforcing method
The invention discloses a coal measure stratum mudstone slope system reinforcing method. The method comprises the four steps of subarea surface drainage, electrochemical drainage, intermittent retaining wall blocking and anchor cable passive traction. According to the method, the side slope is subjected to zoning treatment, and measures are conveniently applied according to the zones; electrochemical drainage is matched with crack filling, so that the purpose of continuously reinforcing the local side slope is achieved, and the previous once and for all treatment concept is changed; a plurality of groups of V-shaped reinforced triangular areas are combined to realize a group column effect, and multi-point force generation realizes linkage treatment; the segmented retaining wall blocks the mutual influence between the upper and lower partitions, realizes the binding between the two adjacent partitions, and provides effective support for the partitions; and the anchor cables are passively dragged to continuously reinforce weak areas and marginal areas, so that the comprehensive system treatment targets of general treatment without dead angles and strengthening of key areas are achieved.
本发明公开了一种煤系地层泥岩边坡系统加固方法,包括分区地表排水、电化学排水、间断挡墙阻隔、锚索被动牵引四个步骤;本发明对边坡进行分区治理,便于因区施策;电化学排水配合裂缝填充,实现持续加固局部边坡的目的,改变以往一劳永逸的治理理念;采用多组V型加固三角区域联合实现群柱效应,多点发力实现联动治理;分段挡墙阻断了上下分区间的相互影响,实现了相邻两个分区间的捆绑,为分区提供了有效支撑;锚索被动牵引持续加固软弱区、边缘区,实现了普遍治理无死角,重点区域可强化的综合系统治理目标。
Coal measure stratum mudstone slope system reinforcing method
一种煤系地层泥岩边坡系统加固方法
HAN LIU (author) / CHEN YANLONG (author)
2024-09-20
Patent
Electronic Resource
Chinese
Mudstone stratum shield tunnel portal slope supporting mechanism and supporting method
European Patent Office | 2024
|Stratum reinforcing method and stratum reinforcing structure
European Patent Office | 2024
|Stratified slope rock stratum reinforcing and drainage system and construction method
European Patent Office | 2021
|Mudstone ecological slope protection system and slope protection method
European Patent Office | 2020
|Mudstone stratum shield muck baking-free brick and preparation method thereof
European Patent Office | 2024
|