The invention discloses a stratum reinforcing method and a stratum reinforcing structure. The stratum reinforcing method comprises the steps that a guide groove is excavated; measuring and drawing a plurality of reinforcing positions in the guide groove; according to the arrangement sequence of the multiple reinforcement positions, one reinforcement position is selected as the current reinforcement position; a first pile hole and a second pile hole are excavated in the current reinforcing position, and cement is poured to form a first reinforcing pile and a second reinforcing pile correspondingly; a third pile hole is excavated in the current reinforcing position, and cement is poured to form a third reinforcing pile; and the step that the first pile hole and the second pile hole are excavated downwards at the current reinforcing position, and the cement is poured into the first pile hole and the second pile hole to form the first reinforcing pile and the second reinforcing pile correspondingly is executed till the reinforcing positions form the reinforcing assemblies, and the multiple reinforcing assemblies form the reinforcing structure. According to the method, disturbance to the stratum of the to-be-reinforced area is reduced, and the reinforcing effect of the stratum of the to-be-reinforced area is improved.
本发明公开了一种地层加固方法和地层加固结构,地层加固方法包括:开挖一导向槽;在所述导向槽内测量并绘制出多个加固位;按照多个所述加固位的排布次序,选择一所述加固位为当前加固位;在所述当前加固位开挖第一桩孔和第二桩孔,并浇筑水泥以分别形成第一加固桩和第二加固桩;在所述当前加固位开挖第三桩孔,并浇筑水泥以形成所述第三加固桩;返回执行所述在所述当前加固位向下开挖第一桩孔和第二桩孔,并向所述第一桩孔和所述第二桩孔浇筑水泥以分别形成第一加固桩和第二加固桩的步骤,直至各所述加固位均形成所述加固组件,多个所述加固组件组成加固结构。本发明减小了对待加固区域的地层造成的扰动,提高了待加固区域的地层的加固效果。
Stratum reinforcing method and stratum reinforcing structure
The invention discloses a stratum reinforcing method and a stratum reinforcing structure. The stratum reinforcing method comprises the steps that a guide groove is excavated; measuring and drawing a plurality of reinforcing positions in the guide groove; according to the arrangement sequence of the multiple reinforcement positions, one reinforcement position is selected as the current reinforcement position; a first pile hole and a second pile hole are excavated in the current reinforcing position, and cement is poured to form a first reinforcing pile and a second reinforcing pile correspondingly; a third pile hole is excavated in the current reinforcing position, and cement is poured to form a third reinforcing pile; and the step that the first pile hole and the second pile hole are excavated downwards at the current reinforcing position, and the cement is poured into the first pile hole and the second pile hole to form the first reinforcing pile and the second reinforcing pile correspondingly is executed till the reinforcing positions form the reinforcing assemblies, and the multiple reinforcing assemblies form the reinforcing structure. According to the method, disturbance to the stratum of the to-be-reinforced area is reduced, and the reinforcing effect of the stratum of the to-be-reinforced area is improved.
本发明公开了一种地层加固方法和地层加固结构,地层加固方法包括:开挖一导向槽;在所述导向槽内测量并绘制出多个加固位;按照多个所述加固位的排布次序,选择一所述加固位为当前加固位;在所述当前加固位开挖第一桩孔和第二桩孔,并浇筑水泥以分别形成第一加固桩和第二加固桩;在所述当前加固位开挖第三桩孔,并浇筑水泥以形成所述第三加固桩;返回执行所述在所述当前加固位向下开挖第一桩孔和第二桩孔,并向所述第一桩孔和所述第二桩孔浇筑水泥以分别形成第一加固桩和第二加固桩的步骤,直至各所述加固位均形成所述加固组件,多个所述加固组件组成加固结构。本发明减小了对待加固区域的地层造成的扰动,提高了待加固区域的地层的加固效果。
Stratum reinforcing method and stratum reinforcing structure
地层加固方法和地层加固结构
ZHAO YUNXIANG (author) / CAI LONG (author) / ZHANG TIANXIONG (author) / QIAO WENJIAN (author) / WANG ZHIQUAN (author) / YAN MING (author) / LI XIAN (author) / GUO YUHANG (author)
2024-10-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Reinforcing device and reinforcing method for irregular rock stratum side wall
European Patent Office | 2022
|Reinforcing construction method for blasting loose rock stratum
European Patent Office | 2024
|Coal measure stratum mudstone slope system reinforcing method
European Patent Office | 2024
|