A platform for research: civil engineering, architecture and urbanism
Traction system
The traction system comprises a traction structure and a guide structure, the traction structure comprises a first traction piece, a second traction piece and a plurality of connecting pieces, the first traction piece and the second traction piece are oppositely arranged, the first traction piece is arranged on a shore A, the second traction piece is arranged on a shore B, and the two ends of all the connecting pieces are connected with the first traction piece and the second traction piece correspondingly; all the connecting pieces are suitable for being connected with a transportation structure; the guiding structure comprises a plurality of groups of first guiding assemblies and second guiding assemblies, the first guiding assemblies are arranged on the A-shore cable bent tower, the second guiding assemblies are arranged on the B-shore cable bent tower, and the two ends of all the connecting pieces are suitable for penetrating through the first guiding assemblies and the second guiding assemblies correspondingly and are connected with the first traction piece and the second traction piece correspondingly. The traction system of the structure adapts to different construction stages of the suspension bridge by controlling the number of the connecting pieces between the first traction piece and the second traction piece, so that the transportation efficiency of the transportation structure and the stability in the transportation process are improved.
本发明公开了一种牵引系统,包括牵引结构和导向结构,牵引结构包括相对设置的第一牵引件和第二牵引件以及若干连接件,第一牵引件设置在A岸,第二牵引件设置在B岸,所有的连接件的两端分别与第一牵引件和第二牵引件连接,且所有的连接件均适于与运输结构连接;导向结构包括若干组第一导向组件和第二导向组件,第一导向组件设置在A岸索塔上,第二导向组件设置在B岸索塔上,所有的连接件的两端均分别适于穿过第一导向组件和第二导向组件、且分别与第一牵引件和第二牵引件连接。上述结构的牵引系统,通过控制第一牵引件和第二牵引件之间的连接件的数量,来适应悬索桥的不同施工阶段,以提高运输结构的运输效率和运输过程中的稳定性。
Traction system
The traction system comprises a traction structure and a guide structure, the traction structure comprises a first traction piece, a second traction piece and a plurality of connecting pieces, the first traction piece and the second traction piece are oppositely arranged, the first traction piece is arranged on a shore A, the second traction piece is arranged on a shore B, and the two ends of all the connecting pieces are connected with the first traction piece and the second traction piece correspondingly; all the connecting pieces are suitable for being connected with a transportation structure; the guiding structure comprises a plurality of groups of first guiding assemblies and second guiding assemblies, the first guiding assemblies are arranged on the A-shore cable bent tower, the second guiding assemblies are arranged on the B-shore cable bent tower, and the two ends of all the connecting pieces are suitable for penetrating through the first guiding assemblies and the second guiding assemblies correspondingly and are connected with the first traction piece and the second traction piece correspondingly. The traction system of the structure adapts to different construction stages of the suspension bridge by controlling the number of the connecting pieces between the first traction piece and the second traction piece, so that the transportation efficiency of the transportation structure and the stability in the transportation process are improved.
本发明公开了一种牵引系统,包括牵引结构和导向结构,牵引结构包括相对设置的第一牵引件和第二牵引件以及若干连接件,第一牵引件设置在A岸,第二牵引件设置在B岸,所有的连接件的两端分别与第一牵引件和第二牵引件连接,且所有的连接件均适于与运输结构连接;导向结构包括若干组第一导向组件和第二导向组件,第一导向组件设置在A岸索塔上,第二导向组件设置在B岸索塔上,所有的连接件的两端均分别适于穿过第一导向组件和第二导向组件、且分别与第一牵引件和第二牵引件连接。上述结构的牵引系统,通过控制第一牵引件和第二牵引件之间的连接件的数量,来适应悬索桥的不同施工阶段,以提高运输结构的运输效率和运输过程中的稳定性。
Traction system
一种牵引系统
TAO YE (author) / WEI KANG (author) / ZHANG DONGSHAN (author) / LIU KE (author)
2024-10-01
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Main cable strand traction system and traction method thereof
European Patent Office | 2021
|Traction force adjusting system, loading machine and traction force adjusting method
European Patent Office | 2023
|