A platform for research: civil engineering, architecture and urbanism
Construction method of large-section concrete batter post
The invention relates to the technical field of building construction, and provides a construction method of a large-section concrete batter post, which comprises the following steps of: erecting a first support frame body; erecting a first template; carrying out batter post reinforcement cage binding construction, and placing the guide reinforcement cage in the batter post reinforcement cage; a second formwork, a third formwork and a fourth formwork are erected, and a formwork system provided with an inclined column pouring cavity is formed; a second supporting frame body is erected; the second supporting frame body is connected with the first supporting frame body to form a supporting system; and concrete is poured into the batter post pouring cavity, the vibrating rod is placed in the guide reinforcement cage, and the vibrating rod is synchronously lifted along with concrete pouring. The vibrating rod can reach the bottom of the inclined column reinforcement cage along the guide reinforcement cage, can be lifted along the guide reinforcement cage and cannot be clamped by the guide reinforcement cage, so that the vibrating quality is ensured, and the construction efficiency is improved. In addition, the guide reinforcement cage is permanently retained in the batter post, so that the quality of the batter post is improved.
本申请涉及建筑施工技术领域,提供了一种大截面混凝土斜柱的施工方法,包括以下步骤:搭设第一支撑架体;支设第一模板;进行斜柱钢筋笼绑扎施工,将导向钢筋笼置于斜柱钢筋笼内;支设第二模板、第三模板以及第四模板,形成配置有斜柱浇筑腔的模板体系;搭设第二支撑架体;将第二支撑架体与第一支撑架体连接,形成支撑体系;将混凝土浇筑至斜柱浇筑腔内,将振捣棒置于导向钢筋笼内,随混凝土浇筑同步提升振捣棒。振捣棒可顺着导向钢筋笼到达斜柱钢筋笼的底部,可沿导向钢筋笼提升,不会被导向钢筋笼卡住,保证了振捣质量,提高了施工效率。另外,导向钢筋笼被永久留置在斜柱内,提高了斜柱的质量。
Construction method of large-section concrete batter post
The invention relates to the technical field of building construction, and provides a construction method of a large-section concrete batter post, which comprises the following steps of: erecting a first support frame body; erecting a first template; carrying out batter post reinforcement cage binding construction, and placing the guide reinforcement cage in the batter post reinforcement cage; a second formwork, a third formwork and a fourth formwork are erected, and a formwork system provided with an inclined column pouring cavity is formed; a second supporting frame body is erected; the second supporting frame body is connected with the first supporting frame body to form a supporting system; and concrete is poured into the batter post pouring cavity, the vibrating rod is placed in the guide reinforcement cage, and the vibrating rod is synchronously lifted along with concrete pouring. The vibrating rod can reach the bottom of the inclined column reinforcement cage along the guide reinforcement cage, can be lifted along the guide reinforcement cage and cannot be clamped by the guide reinforcement cage, so that the vibrating quality is ensured, and the construction efficiency is improved. In addition, the guide reinforcement cage is permanently retained in the batter post, so that the quality of the batter post is improved.
本申请涉及建筑施工技术领域,提供了一种大截面混凝土斜柱的施工方法,包括以下步骤:搭设第一支撑架体;支设第一模板;进行斜柱钢筋笼绑扎施工,将导向钢筋笼置于斜柱钢筋笼内;支设第二模板、第三模板以及第四模板,形成配置有斜柱浇筑腔的模板体系;搭设第二支撑架体;将第二支撑架体与第一支撑架体连接,形成支撑体系;将混凝土浇筑至斜柱浇筑腔内,将振捣棒置于导向钢筋笼内,随混凝土浇筑同步提升振捣棒。振捣棒可顺着导向钢筋笼到达斜柱钢筋笼的底部,可沿导向钢筋笼提升,不会被导向钢筋笼卡住,保证了振捣质量,提高了施工效率。另外,导向钢筋笼被永久留置在斜柱内,提高了斜柱的质量。
Construction method of large-section concrete batter post
一种大截面混凝土斜柱的施工方法
CHEN YIXIONG (author) / GAO DENG (author) / MI MINGJIE (author) / LI WEIQUAN (author) / CHEN TAO (author) / SHI QIANG (author) / LI PEICHENG (author)
2024-10-01
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Large-section independent batter post construction method based on BIM technology
European Patent Office | 2022
|Construction method of large-diameter circular steel reinforced concrete batter post
European Patent Office | 2023
|Protective dismantling construction device for concrete batter post
European Patent Office | 2022
|