A platform for research: civil engineering, architecture and urbanism
Construction method of turnover assembly type tower crane foundation
The invention relates to the technical field of building construction, in particular to a turnover assembly type tower crane foundation construction method which comprises the technological processes of cast-in-place pile and latticed column construction, local structure top plate construction, assembly type tower crane foundation installation and tower crane installation. Installation of the tower crane foundation can be completed before construction of the horizontal supporting beam, the construction progress is accelerated, the tower crane foundation is of an assembly type structure, all parts can be carried out by factories, the site construction process is reduced, the workload of constructors is reduced, the construction cost is reduced, use of materials and generation of construction waste are reduced, and the development trend of green buildings is met.
本发明涉及建筑施工技术领域,尤其涉及一种可周转装配式塔吊基础施工方法,其工艺流程为灌注桩及格构柱施工‑局部结构顶板施工‑装配式塔吊基础安装‑塔吊安装,本发明通过格构柱将塔吊基础置于地下室结构顶板以上,可以在水平支撑梁施工前完成塔吊基础的安装,加快施工进度,塔吊基础为装配式结构,各部分可工厂与之,减少现场施工过程,减少施工人员工作量,降低施工成本,减少材料的使用和建筑垃圾的产生,符合绿色建筑的发展趋势。
Construction method of turnover assembly type tower crane foundation
The invention relates to the technical field of building construction, in particular to a turnover assembly type tower crane foundation construction method which comprises the technological processes of cast-in-place pile and latticed column construction, local structure top plate construction, assembly type tower crane foundation installation and tower crane installation. Installation of the tower crane foundation can be completed before construction of the horizontal supporting beam, the construction progress is accelerated, the tower crane foundation is of an assembly type structure, all parts can be carried out by factories, the site construction process is reduced, the workload of constructors is reduced, the construction cost is reduced, use of materials and generation of construction waste are reduced, and the development trend of green buildings is met.
本发明涉及建筑施工技术领域,尤其涉及一种可周转装配式塔吊基础施工方法,其工艺流程为灌注桩及格构柱施工‑局部结构顶板施工‑装配式塔吊基础安装‑塔吊安装,本发明通过格构柱将塔吊基础置于地下室结构顶板以上,可以在水平支撑梁施工前完成塔吊基础的安装,加快施工进度,塔吊基础为装配式结构,各部分可工厂与之,减少现场施工过程,减少施工人员工作量,降低施工成本,减少材料的使用和建筑垃圾的产生,符合绿色建筑的发展趋势。
Construction method of turnover assembly type tower crane foundation
可周转装配式塔吊基础施工方法
CAO QINGWEN (author) / PAN JIAN (author) / JIN FANFEI (author) / LEE MYUNG IL (author) / XIAO KUN (author)
2024-10-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Turnover assembly type universal tower crane foundation and construction method thereof
European Patent Office | 2022
|Turnover shaped tower crane foundation steel platform and construction method thereof
European Patent Office | 2024
|Tower crane foundation for foundation pit and construction method of tower crane foundation
European Patent Office | 2020
|Bridge full-assembly type tower crane foundation and construction method thereof
European Patent Office | 2023
|Semi-cantilever type tower crane foundation construction method
European Patent Office | 2024
|