Marine mud layer reinforcement treatment equipment and treatment method
The invention relates to marine mud layer reinforcement treatment equipment and method, and relates to the technical field of stratum reinforcement, the reinforcement treatment equipment comprises a walking mechanism, a working platform, a drilling mechanism and a pile pressing mechanism, the walking mechanism is arranged on the lower side of the working platform, and the drilling mechanism and the pile pressing mechanism are both arranged on the upper side of the working platform; the drilling mechanism comprises a drilling frame, the drilling frame is arranged in the vertical direction, the lower end of the drilling frame is connected with the working platform, a drilling rod is arranged on the drilling frame, the drilling rod is arranged in the vertical direction, and a rotation driving part and a pushing driving part are further arranged on the drilling frame; the pile pressing mechanism comprises a pile pressing support and a lifting machine, the lifting machine is arranged on the working platform, the pile pressing support is arranged in the vertical direction, the lower end of the pile pressing support is connected with the working platform, a clamping piece is arranged on the pile pressing support, and a pile pressing driving piece is further arranged on the pile pressing support. According to the construction method, the coherence of drilling, pile pressing and pouring operation can be improved, so that the construction speed can be increased, and the required construction time is shortened.
本申请涉及一种海相泥层加固处理设备及处理方法,涉及地层加固的技术领域,加固处理设备包括行走机构、工作平台、钻孔机构和压桩机构,行走机构设置在工作平台下侧,钻孔机构和压桩机构均设置在工作平台上侧;钻孔机构包括钻架,钻架沿竖直方向设置,并且钻架下端与工作平台连接,钻架上设置有钻杆,钻杆沿竖直方向设置,并且钻架上还设置有回转驱动件以及推进驱动件;压桩机构包括压桩支架和起吊机,起吊机设置在工作平台上,压桩支架沿竖直方向设置,并且压桩支架下端与工作平台连接,压桩支架上设置有夹持件,压桩支架上还设置有压桩驱动件。本申请能够增加钻孔、压桩和灌注作业的连贯性,从而能够加快施工速度,降低所需要的施工时间。
Marine mud layer reinforcement treatment equipment and treatment method
The invention relates to marine mud layer reinforcement treatment equipment and method, and relates to the technical field of stratum reinforcement, the reinforcement treatment equipment comprises a walking mechanism, a working platform, a drilling mechanism and a pile pressing mechanism, the walking mechanism is arranged on the lower side of the working platform, and the drilling mechanism and the pile pressing mechanism are both arranged on the upper side of the working platform; the drilling mechanism comprises a drilling frame, the drilling frame is arranged in the vertical direction, the lower end of the drilling frame is connected with the working platform, a drilling rod is arranged on the drilling frame, the drilling rod is arranged in the vertical direction, and a rotation driving part and a pushing driving part are further arranged on the drilling frame; the pile pressing mechanism comprises a pile pressing support and a lifting machine, the lifting machine is arranged on the working platform, the pile pressing support is arranged in the vertical direction, the lower end of the pile pressing support is connected with the working platform, a clamping piece is arranged on the pile pressing support, and a pile pressing driving piece is further arranged on the pile pressing support. According to the construction method, the coherence of drilling, pile pressing and pouring operation can be improved, so that the construction speed can be increased, and the required construction time is shortened.
本申请涉及一种海相泥层加固处理设备及处理方法,涉及地层加固的技术领域,加固处理设备包括行走机构、工作平台、钻孔机构和压桩机构,行走机构设置在工作平台下侧,钻孔机构和压桩机构均设置在工作平台上侧;钻孔机构包括钻架,钻架沿竖直方向设置,并且钻架下端与工作平台连接,钻架上设置有钻杆,钻杆沿竖直方向设置,并且钻架上还设置有回转驱动件以及推进驱动件;压桩机构包括压桩支架和起吊机,起吊机设置在工作平台上,压桩支架沿竖直方向设置,并且压桩支架下端与工作平台连接,压桩支架上设置有夹持件,压桩支架上还设置有压桩驱动件。本申请能够增加钻孔、压桩和灌注作业的连贯性,从而能够加快施工速度,降低所需要的施工时间。
Marine mud layer reinforcement treatment equipment and treatment method
一种海相泥层加固处理设备及处理方法
CHENG SHIBING (author) / QIAO MING (author) / XU XIAOQUAN (author) / CHEN GUANG (author) / SHI HEJIE (author) / YANG HAI (author) / XIONG YUPENG (author) / LIAO FENG (author) / KANG TAOTAO (author) / YANG CHAO (author)
2024-10-15
Patent
Electronic Resource
Chinese
Soft soil foundation layer drainage reinforcement treatment method
European Patent Office | 2023
|European Patent Office | 2022
|