Large-scale assembly type glass curtain wall installation method
The invention provides a large assembly type glass curtain wall installation method, and belongs to the technical field of assembly type glass curtain wall installing.The large assembly type glass curtain wall installation method comprises the steps that according to the structure of the installation position of a glass curtain wall and a design drawing of the glass curtain wall, a glass curtain wall assembly of the corresponding shape and size is produced; the multiple glass curtain wall assemblies are sequentially placed, and after damping assemblies are placed in the adjacent glass curtain wall assemblies, the glass curtain wall assemblies are moved to a construction site; the hoisting assembly is fixed to the surface of the glass curtain wall assembly and moved to a mounting position through a tower crane; a constructor fixes mounting frames on the edges of the mounting positions of the corresponding glass curtain wall assemblies, and the glass curtain wall assemblies are sequentially fixed into the corresponding mounting frames; a gap between the mounting frame and the glass curtain wall assembly is filled with a fixing agent in sequence through a stamping assembly; the problems that when an existing large assembly type glass curtain wall is installed, the loss rate is high, and the installation efficiency is low can be solved.
本发明提供了一种大型装配式玻璃幕墙安装方法,属于装配式玻璃幕墙安装技术领域,该大型装配式玻璃幕墙安装方法包括根据玻璃幕墙的安装位置的结构以及该玻璃幕墙的设计图纸生产对应形状和尺寸的玻璃幕墙组件;将多个所述玻璃幕墙组件依次放置,在相邻的所述玻璃幕墙组件的内部放置减震组件后,移动至施工场地;将所述吊装组件固定在所述玻璃幕墙组件的表面,通过塔吊移动至安装位置;施工人员在对应的所述玻璃幕墙组件的安装位置边缘固定安装框,并将所述玻璃幕墙组件依次固定在对应的所述安装框中;通过冲压组件依次将固定剂填充到所述安装框与所述玻璃幕墙组件的空隙中;能够解决现有的大型装配式玻璃幕墙安装时的损耗率高且安装效率低的问题。
Large-scale assembly type glass curtain wall installation method
The invention provides a large assembly type glass curtain wall installation method, and belongs to the technical field of assembly type glass curtain wall installing.The large assembly type glass curtain wall installation method comprises the steps that according to the structure of the installation position of a glass curtain wall and a design drawing of the glass curtain wall, a glass curtain wall assembly of the corresponding shape and size is produced; the multiple glass curtain wall assemblies are sequentially placed, and after damping assemblies are placed in the adjacent glass curtain wall assemblies, the glass curtain wall assemblies are moved to a construction site; the hoisting assembly is fixed to the surface of the glass curtain wall assembly and moved to a mounting position through a tower crane; a constructor fixes mounting frames on the edges of the mounting positions of the corresponding glass curtain wall assemblies, and the glass curtain wall assemblies are sequentially fixed into the corresponding mounting frames; a gap between the mounting frame and the glass curtain wall assembly is filled with a fixing agent in sequence through a stamping assembly; the problems that when an existing large assembly type glass curtain wall is installed, the loss rate is high, and the installation efficiency is low can be solved.
本发明提供了一种大型装配式玻璃幕墙安装方法,属于装配式玻璃幕墙安装技术领域,该大型装配式玻璃幕墙安装方法包括根据玻璃幕墙的安装位置的结构以及该玻璃幕墙的设计图纸生产对应形状和尺寸的玻璃幕墙组件;将多个所述玻璃幕墙组件依次放置,在相邻的所述玻璃幕墙组件的内部放置减震组件后,移动至施工场地;将所述吊装组件固定在所述玻璃幕墙组件的表面,通过塔吊移动至安装位置;施工人员在对应的所述玻璃幕墙组件的安装位置边缘固定安装框,并将所述玻璃幕墙组件依次固定在对应的所述安装框中;通过冲压组件依次将固定剂填充到所述安装框与所述玻璃幕墙组件的空隙中;能够解决现有的大型装配式玻璃幕墙安装时的损耗率高且安装效率低的问题。
Large-scale assembly type glass curtain wall installation method
一种大型装配式玻璃幕墙安装方法
MA YOUMIN (author) / ZHAO YAN (author) / YANG MAOLIANG (author) / LI XING (author) / LI WENBIAO (author) / YU HUACHAO (author)
2024-10-18
Patent
Electronic Resource
Chinese
Large-span hanging type glass curtain wall installation method
European Patent Office | 2021
|Frame type glass curtain wall installation method and glass curtain wall system
European Patent Office | 2020
|Hanging installation assembly and photovoltaic glass curtain wall
European Patent Office | 2023
|