A platform for research: civil engineering, architecture and urbanism
Post-construction differential settlement adjusting system and reinforced building solid waste embankment
The invention discloses a post-construction differential settlement adjusting system and a reinforced building solid waste embankment, belongs to the technical field of building solid waste embankments, and aims to solve at least one problem that the maintenance cost and time are increased due to post-construction settlement in the prior art. The system is arranged in an embankment in the longitudinal direction, and the post-construction differential settlement adjusting system comprises a bearing platform, an elastic bag arranged on the bearing platform and an expansion rubber body filled in a bag cavity of the elastic bag. The method can be used for post-construction differential settlement adjustment of the reinforced building solid waste embankment.
本发明公开了一种工后差异沉降调节系统及加筋建筑固废路堤,属于建筑固废路堤技术领域,用以解决现有技术中工后沉降导致路面不平整、坑洼、凸起、增加维护成本和时间的至少要一个问题。该系统,沿纵向设于路堤中,工后差异沉降调节系统包括承台、设于承台上的弹性囊以及填充于弹性囊囊腔内的膨胀橡胶体。本发明可用于加筋建筑固废路堤的工后差异沉降调节。
Post-construction differential settlement adjusting system and reinforced building solid waste embankment
The invention discloses a post-construction differential settlement adjusting system and a reinforced building solid waste embankment, belongs to the technical field of building solid waste embankments, and aims to solve at least one problem that the maintenance cost and time are increased due to post-construction settlement in the prior art. The system is arranged in an embankment in the longitudinal direction, and the post-construction differential settlement adjusting system comprises a bearing platform, an elastic bag arranged on the bearing platform and an expansion rubber body filled in a bag cavity of the elastic bag. The method can be used for post-construction differential settlement adjustment of the reinforced building solid waste embankment.
本发明公开了一种工后差异沉降调节系统及加筋建筑固废路堤,属于建筑固废路堤技术领域,用以解决现有技术中工后沉降导致路面不平整、坑洼、凸起、增加维护成本和时间的至少要一个问题。该系统,沿纵向设于路堤中,工后差异沉降调节系统包括承台、设于承台上的弹性囊以及填充于弹性囊囊腔内的膨胀橡胶体。本发明可用于加筋建筑固废路堤的工后差异沉降调节。
Post-construction differential settlement adjusting system and reinforced building solid waste embankment
一种工后差异沉降调节系统及加筋建筑固废路堤
YANG GUANGQING (author) / ZHANG DA (author) / SUN QIAN (author) / ZHAO JIANHONG (author) / XU PENG (author) / LI TING (author) / JIA ZI (author) / LIU WEICHAO (author) / WU BIN (author) / WANG HE (author)
2024-10-22
Patent
Electronic Resource
Chinese
Reinforced embankment structure adopting building solid waste and construction method
European Patent Office | 2024
|Tail anchoring component of reinforced material and reinforced building solid waste embankment
European Patent Office | 2024
|Adjusting device suitable for building differential settlement
European Patent Office | 2021
|Settlement of embankment on reinforced granular fill - Soft soil system
British Library Conference Proceedings | 1996
|