A platform for research: civil engineering, architecture and urbanism
Breast wall revetment formwork based on channel construction and installation method thereof
According to the embodiment of the invention, the breast wall revetment formwork based on channel construction comprises a first formwork and a second formwork which are vertically arranged in parallel, a plurality of connecting devices are arranged between the first formwork and the second formwork, a first connecting rod and a second connecting rod are arranged at the top of the end face, and a pile head is arranged at the bottom of the end face. The ends of the first connecting rod and the second connecting rod are respectively provided with a stretching device, and the stretching devices are fixedly connected with the pile head through pull ropes. The invention further provides an installation method of the breast wall revetment formwork based on channel construction. The installation efficiency of the formwork is high, and the construction speed is increased; and meanwhile, workers and equipment required during installation are reduced, and the construction cost is reduced. According to the method, extra space does not need to be occupied, construction can be completed only through a small working face, and therefore the method can be used for breast wall revetment construction under various terrains and has a wider application range.
本发明提供了根据本发明的实施例,一种基于航道建设的胸墙护岸模板,包括并列竖直设置的第一模板和第二模板,两者之间设有若干连接装置,端面的顶部设有第一连接杆和第二连接杆,端面的底部位置设有桩头,第一连接杆和第二连接杆的端头处分别设有拉伸装置,通过拉绳与桩头固定连接。本发明还提出了一基于航道建设的胸墙护岸模板的安装方法。本发明的模板的安装效率高,提升了施工速度;同时安装时所需要的工人和设备变少,施工成本降低。本发明则无需占用额外的空间,仅需要较小的作业面即可完成施工,因此可以用于各种地形下的胸墙护岸建设,具有更广泛的适用范围。
Breast wall revetment formwork based on channel construction and installation method thereof
According to the embodiment of the invention, the breast wall revetment formwork based on channel construction comprises a first formwork and a second formwork which are vertically arranged in parallel, a plurality of connecting devices are arranged between the first formwork and the second formwork, a first connecting rod and a second connecting rod are arranged at the top of the end face, and a pile head is arranged at the bottom of the end face. The ends of the first connecting rod and the second connecting rod are respectively provided with a stretching device, and the stretching devices are fixedly connected with the pile head through pull ropes. The invention further provides an installation method of the breast wall revetment formwork based on channel construction. The installation efficiency of the formwork is high, and the construction speed is increased; and meanwhile, workers and equipment required during installation are reduced, and the construction cost is reduced. According to the method, extra space does not need to be occupied, construction can be completed only through a small working face, and therefore the method can be used for breast wall revetment construction under various terrains and has a wider application range.
本发明提供了根据本发明的实施例,一种基于航道建设的胸墙护岸模板,包括并列竖直设置的第一模板和第二模板,两者之间设有若干连接装置,端面的顶部设有第一连接杆和第二连接杆,端面的底部位置设有桩头,第一连接杆和第二连接杆的端头处分别设有拉伸装置,通过拉绳与桩头固定连接。本发明还提出了一基于航道建设的胸墙护岸模板的安装方法。本发明的模板的安装效率高,提升了施工速度;同时安装时所需要的工人和设备变少,施工成本降低。本发明则无需占用额外的空间,仅需要较小的作业面即可完成施工,因此可以用于各种地形下的胸墙护岸建设,具有更广泛的适用范围。
Breast wall revetment formwork based on channel construction and installation method thereof
一种基于航道建设的胸墙护岸模板及其安装方法
HAO WENGANG (author) / ZOU DINGGUO (author) / LI QIUSHUO (author) / ZHANG PENG (author) / YE JINGHU (author) / SI ZHAOBO (author) / WAN LI (author) / YU LEIYU (author) / LING ZHENGBAO (author) / LIU JINHUI (author)
2024-10-22
Patent
Electronic Resource
Chinese
Formwork construction process used for revetment retaining wall
European Patent Office | 2020
|Revetment retaining wall and construction method thereof
European Patent Office | 2024
|Ecological channel revetment and construction method thereof
European Patent Office | 2020
|