Off-board welding integrated rail changing construction method
The invention discloses a non-vehicle-mounted welding integrated rail changing construction method, which realizes an integrated construction mode of completing rail unloading, rail welding, rail changing and rail collecting on the same day in a section of superposing 25% o ramps at the height of 175 mm within the blocking time of 335 minutes by using existing movable rail welding equipment, can achieve the effects of complete material discharging after work and clear people walking on the site, and can also achieve the purpose of replacing the rail in the construction process of the movable rail welding equipment at the time of 335 minutes. And on the premise that thermit welding is not used in one skylight, two pairs of new steel rails can be replaced, welded and collected, and interference to transportation and capital investment are reduced.
本申请公开了本申请提供了一种非车载焊一体化换轨施工方法,实现利用既有移动焊轨设备,在335分钟封锁时间内,在175mm超高叠加25‰坡道地段完成当天卸轨、焊轨、换轨、收轨的一体化施工模式,既能做到工完料净、人走场清,又能满足在一个天窗内不使用铝热焊的前提下,完成两对新钢轨换、焊、收施工,减少对运输的干扰和资金投入。
Off-board welding integrated rail changing construction method
The invention discloses a non-vehicle-mounted welding integrated rail changing construction method, which realizes an integrated construction mode of completing rail unloading, rail welding, rail changing and rail collecting on the same day in a section of superposing 25% o ramps at the height of 175 mm within the blocking time of 335 minutes by using existing movable rail welding equipment, can achieve the effects of complete material discharging after work and clear people walking on the site, and can also achieve the purpose of replacing the rail in the construction process of the movable rail welding equipment at the time of 335 minutes. And on the premise that thermit welding is not used in one skylight, two pairs of new steel rails can be replaced, welded and collected, and interference to transportation and capital investment are reduced.
本申请公开了本申请提供了一种非车载焊一体化换轨施工方法,实现利用既有移动焊轨设备,在335分钟封锁时间内,在175mm超高叠加25‰坡道地段完成当天卸轨、焊轨、换轨、收轨的一体化施工模式,既能做到工完料净、人走场清,又能满足在一个天窗内不使用铝热焊的前提下,完成两对新钢轨换、焊、收施工,减少对运输的干扰和资金投入。
Off-board welding integrated rail changing construction method
一种非车载焊一体化换轨施工方法
HUANG CAIMING (author) / MA XIAOYANG (author) / XU JIANSEN (author) / ZHANG YANG (author) / MAO WEI (author) / GAO YAJUN (author) / ZHANG YU (author) / WANG PENG (author) / LI JIE (author) / ZHOU YONGXING (author)
2024-11-01
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Welding changing and welding operation vehicle set and rail changing method
European Patent Office | 2021
|Rail welding trolley multiple rail welding replacing construction method
European Patent Office | 2015
|High-speed railway integrated rail changing train arrangement structure and rail changing method
European Patent Office | 2022
|Rail changing machine wheel, rail changing machine and rail finding method
European Patent Office | 2020
|