A platform for research: civil engineering, architecture and urbanism
Construction method of fabricated aluminum mold temporary support
The invention provides a construction method of a fabricated aluminum mold temporary support, which comprises a supporting device, the supporting device comprises a first supporting rod and a second supporting rod which are detachably connected, and a connecting sleeve used for connecting the first supporting rod and the second supporting rod, and the connecting sleeve is provided with a fixing port used for fixing a connecting rod; the construction method comprises the following steps that S1, the strip-shaped aluminum formworks are arranged between the cast-in-place main beam and the cast-in-place secondary beam, and all intersection points of the strip-shaped aluminum formworks serve as supporting points; s2, arranging strip-shaped aluminum mold belts among the supporting points to form a top horizontal support; and S3, the supporting devices are arranged at the supporting points, bottom vertical supporting is formed, the far ends of the first supporting rods and the far ends of the second supporting rods are fixed to the supporting points and the ground correspondingly, every two adjacent supporting devices are fixed through the corresponding connecting rods, and therefore the frame supporting system is constructed. The technical problems that in the prior art, an aluminum formwork supporting mode is poor in universality, and the concrete forming quality is poor easily are solved.
本发明提供了一种装配式铝模临时支撑的施工方法,包括支撑装置,所述支撑装置包括可分离连接的第一支撑杆和第二支撑杆,以及用于连接所述第一支撑杆和所述第二支撑杆的连接套筒,所述连接套筒设有固定口,用于固定连接杆;所述施工方法包括以下步骤:S1、条状铝模设于现浇主梁和现浇次梁之间,条状铝模的各交叉点为支撑点;S2、在各支撑点之间设置条状铝模带,形成顶部水平支撑;S3、在各支撑点设置所述支撑装置,形成底部竖直支撑,将所述第一支撑杆和所述第二支撑杆的远端分别固定于支撑点和地面,且相邻两所述支撑装置通过所述连接杆固定,以构造成框架支撑体系。本发明解决了现有技术中存在的铝模板支撑方式通用性较差,易导致混凝土成型质量差的技术问题。
Construction method of fabricated aluminum mold temporary support
The invention provides a construction method of a fabricated aluminum mold temporary support, which comprises a supporting device, the supporting device comprises a first supporting rod and a second supporting rod which are detachably connected, and a connecting sleeve used for connecting the first supporting rod and the second supporting rod, and the connecting sleeve is provided with a fixing port used for fixing a connecting rod; the construction method comprises the following steps that S1, the strip-shaped aluminum formworks are arranged between the cast-in-place main beam and the cast-in-place secondary beam, and all intersection points of the strip-shaped aluminum formworks serve as supporting points; s2, arranging strip-shaped aluminum mold belts among the supporting points to form a top horizontal support; and S3, the supporting devices are arranged at the supporting points, bottom vertical supporting is formed, the far ends of the first supporting rods and the far ends of the second supporting rods are fixed to the supporting points and the ground correspondingly, every two adjacent supporting devices are fixed through the corresponding connecting rods, and therefore the frame supporting system is constructed. The technical problems that in the prior art, an aluminum formwork supporting mode is poor in universality, and the concrete forming quality is poor easily are solved.
本发明提供了一种装配式铝模临时支撑的施工方法,包括支撑装置,所述支撑装置包括可分离连接的第一支撑杆和第二支撑杆,以及用于连接所述第一支撑杆和所述第二支撑杆的连接套筒,所述连接套筒设有固定口,用于固定连接杆;所述施工方法包括以下步骤:S1、条状铝模设于现浇主梁和现浇次梁之间,条状铝模的各交叉点为支撑点;S2、在各支撑点之间设置条状铝模带,形成顶部水平支撑;S3、在各支撑点设置所述支撑装置,形成底部竖直支撑,将所述第一支撑杆和所述第二支撑杆的远端分别固定于支撑点和地面,且相邻两所述支撑装置通过所述连接杆固定,以构造成框架支撑体系。本发明解决了现有技术中存在的铝模板支撑方式通用性较差,易导致混凝土成型质量差的技术问题。
Construction method of fabricated aluminum mold temporary support
一种装配式铝模临时支撑的施工方法
WEI PAN (author) / LI BOLIAN (author) / WANG CHENG (author) / ZHAI HUACHAO (author) / SUN CHUANMEI (author) / JIN HUA (author) / YANG DIANLING (author)
2024-11-05
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Fully-fabricated standardized temporary support structure and construction method
European Patent Office | 2020
|Bottom temporary supporting equipment for fabricated aluminum formwork construction
European Patent Office | 2023
|Construction method of fabricated temporary construction site
European Patent Office | 2024
|TEMPORARY CONSTRUCTION SUPPORT AND TEMPORARY CONSTRUCTION SUPPORT USING METHOD
European Patent Office | 2022
|TEMPORARY CONSTRUCTION SUPPORT AND TEMPORARY CONSTRUCTION SUPPORT USING METHOD
European Patent Office | 2022
|