TEMPORARY CONSTRUCTION SUPPORT AND TEMPORARY CONSTRUCTION SUPPORT USING METHOD
To provide a temporary construction support which can be safely transported by operators and an using method of the temporary construction support.SOLUTION: A temporary construction support comprises: a lower column 10 having a lower pipe section 11, a lower base plate 13, and a lower pipe locking section 12; an adjusting nut 20 rotatably locked to the lower pipe locking section; a screw tube 30 that has first pin holes 33a, 33b and a male screw section 31 and is screwed with the adjusting nut and inserted in the lower pipe section at its lower section; a rotation lock section 40 that prevents the screw tube from rotating with respect to the lower column; an upper column 50 that has an upper pipe section 51, an upper base plate 52, and second pin holes 55a, 55b, and is inserted in the screw tube at its lower section; support pins 60a, 60b that continuously penetrate the first pin holes and the second pin holes to fix the screw tube and the upper column; a lower bottom base 15 provided on a lateral face of the lower base plate; an upper bottom base 54 provided on a lateral face of the upper base plate; a lower gripping section 70 provided on a top face of the lower base plate; and an upper gripping section 80 provided on an undersurface of the upper base plate.SELECTED DRAWING: Figure 1
【課題】作業者が安全に運搬することができる仮設工事用サポート及び仮設工事用サポートの使用方法を提供する。【解決手段】下管部11、下ベース板13、及び下管係止部12を備える下柱10と、下管係止部に回動可能に係止される調整ナット20と、第1ピン穴33a,33b、及び雄ねじ部31を備え、調整ナットに螺合されるとともにその下部が下管部に挿入されるねじ管30と、ねじ管が前記下柱に対して回動することを防止する回り止め部40と、上管部51、上ベース板52、及び第2ピン穴55a,55bを備え、その下部がねじ管に挿入される上柱50と、第1ピン穴及び第2ピン穴を連続して貫通してねじ管と上柱とを固定するサポートピン60a,60bと、下ベース板の側面に設けられる下底辺15と、上ベース板の側面に設けらる上底辺54と、下ベース板の上面に設けられる下掴持部70と、上ベース板の下面に設けられる上掴持部と80と、を備える。【選択図】図1
TEMPORARY CONSTRUCTION SUPPORT AND TEMPORARY CONSTRUCTION SUPPORT USING METHOD
To provide a temporary construction support which can be safely transported by operators and an using method of the temporary construction support.SOLUTION: A temporary construction support comprises: a lower column 10 having a lower pipe section 11, a lower base plate 13, and a lower pipe locking section 12; an adjusting nut 20 rotatably locked to the lower pipe locking section; a screw tube 30 that has first pin holes 33a, 33b and a male screw section 31 and is screwed with the adjusting nut and inserted in the lower pipe section at its lower section; a rotation lock section 40 that prevents the screw tube from rotating with respect to the lower column; an upper column 50 that has an upper pipe section 51, an upper base plate 52, and second pin holes 55a, 55b, and is inserted in the screw tube at its lower section; support pins 60a, 60b that continuously penetrate the first pin holes and the second pin holes to fix the screw tube and the upper column; a lower bottom base 15 provided on a lateral face of the lower base plate; an upper bottom base 54 provided on a lateral face of the upper base plate; a lower gripping section 70 provided on a top face of the lower base plate; and an upper gripping section 80 provided on an undersurface of the upper base plate.SELECTED DRAWING: Figure 1
【課題】作業者が安全に運搬することができる仮設工事用サポート及び仮設工事用サポートの使用方法を提供する。【解決手段】下管部11、下ベース板13、及び下管係止部12を備える下柱10と、下管係止部に回動可能に係止される調整ナット20と、第1ピン穴33a,33b、及び雄ねじ部31を備え、調整ナットに螺合されるとともにその下部が下管部に挿入されるねじ管30と、ねじ管が前記下柱に対して回動することを防止する回り止め部40と、上管部51、上ベース板52、及び第2ピン穴55a,55bを備え、その下部がねじ管に挿入される上柱50と、第1ピン穴及び第2ピン穴を連続して貫通してねじ管と上柱とを固定するサポートピン60a,60bと、下ベース板の側面に設けられる下底辺15と、上ベース板の側面に設けらる上底辺54と、下ベース板の上面に設けられる下掴持部70と、上ベース板の下面に設けられる上掴持部と80と、を備える。【選択図】図1
TEMPORARY CONSTRUCTION SUPPORT AND TEMPORARY CONSTRUCTION SUPPORT USING METHOD
仮設工事用サポート及び仮設工事用サポートの使用方法
UTO TATSUYA (author)
2022-10-13
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
TEMPORARY CONSTRUCTION SUPPORT AND TEMPORARY CONSTRUCTION SUPPORT USING METHOD
European Patent Office | 2022
|Cross beam construction method using temporary prestress as temporary support
European Patent Office | 2020
|