A platform for research: civil engineering, architecture and urbanism
Steel beam construction support of concrete wall embedded part and using method
The invention discloses a steel beam construction support of a concrete wall embedded part and a using method, and belongs to the technical field of engineering construction. A nut sleeve is arranged on one side of the embedded part and is embedded in concrete; the steel beam mounting support is detachably connected with the side, away from the nut sleeve, of the embedded part. The steel beam installation support is arranged in a U shape, and a structural steel beam is installed on the steel beam installation support. According to the steel beam construction support of the concrete wall embedded part and the using method, the step of welding joints on site in current floor slab construction can be reduced, nut sleeves are embedded in a concrete wall, the steel beam construction support can be rapidly installed after concrete formwork removal, a steel beam is installed through the construction support, construction errors can be eliminated, and the construction efficiency is improved. The field welding workload is reduced, manpower is saved, and the construction period is shortened.
本发明公开了一种混凝土墙体预埋件的钢梁施工支座及使用方法,属于工程建筑技术领域,包括预埋件和钢梁安装支座;所述预埋件的一侧设有螺母套筒预埋于混凝土中;所述钢梁安装支座与预埋件远离螺母套筒的一侧可拆卸连接;所述钢梁安装支座呈U形设置,所述钢梁安装支座上安装结构钢梁。本发明所提供的一种混凝土墙体预埋件的钢梁施工支座及使用方法,可减少当前楼板施工中现场的焊节步骤,在混凝土墙体中预埋螺母套筒,混凝土拆模后可以快速安装钢梁施工支座,通过施工支座安装钢梁,可以消除施工误差,减少现场焊接工作量,节约人力并缩短工期。
Steel beam construction support of concrete wall embedded part and using method
The invention discloses a steel beam construction support of a concrete wall embedded part and a using method, and belongs to the technical field of engineering construction. A nut sleeve is arranged on one side of the embedded part and is embedded in concrete; the steel beam mounting support is detachably connected with the side, away from the nut sleeve, of the embedded part. The steel beam installation support is arranged in a U shape, and a structural steel beam is installed on the steel beam installation support. According to the steel beam construction support of the concrete wall embedded part and the using method, the step of welding joints on site in current floor slab construction can be reduced, nut sleeves are embedded in a concrete wall, the steel beam construction support can be rapidly installed after concrete formwork removal, a steel beam is installed through the construction support, construction errors can be eliminated, and the construction efficiency is improved. The field welding workload is reduced, manpower is saved, and the construction period is shortened.
本发明公开了一种混凝土墙体预埋件的钢梁施工支座及使用方法,属于工程建筑技术领域,包括预埋件和钢梁安装支座;所述预埋件的一侧设有螺母套筒预埋于混凝土中;所述钢梁安装支座与预埋件远离螺母套筒的一侧可拆卸连接;所述钢梁安装支座呈U形设置,所述钢梁安装支座上安装结构钢梁。本发明所提供的一种混凝土墙体预埋件的钢梁施工支座及使用方法,可减少当前楼板施工中现场的焊节步骤,在混凝土墙体中预埋螺母套筒,混凝土拆模后可以快速安装钢梁施工支座,通过施工支座安装钢梁,可以消除施工误差,减少现场焊接工作量,节约人力并缩短工期。
Steel beam construction support of concrete wall embedded part and using method
一种混凝土墙体预埋件的钢梁施工支座及使用方法
WANG HONGLIANG (author) / ZHANG JIN (author)
2024-11-15
Patent
Electronic Resource
Chinese
Construction method of core tube shear wall and steel structure beam embedded part
European Patent Office | 2021
|European Patent Office | 2021
|Embedded steel-concrete composite beam and construction method thereof
European Patent Office | 2022
|Embedded concrete beam and fabricated wall connecting joint and construction method thereof
European Patent Office | 2024
|CONCRETE WALL CONSTRUCTION MEMBER, SUPPORT STRUCTURE, AND CONCRETE WALL CONSTRUCTION METHOD
European Patent Office | 2015
|