A platform for research: civil engineering, architecture and urbanism
Safe construction method applied to green building outer wall
The invention relates to the technical field of building outer wall construction, in particular to a safe construction method applied to a green building outer wall, and aims to solve the problems that all-around protection treatment is difficult to carry out on construction workers, negative effects are easily brought to construction safety of the workers in rainy and snowy weather, and construction safety is affected. And meanwhile, the normal operation of the construction work of the green building outer wall cannot be ensured. According to the construction operation platform, the protection device is spliced and then moved to the position close to the outer wall of the green building, construction of workers is facilitated, all-around protection treatment is conducted on the construction workers on the construction operation platform, normal operation of construction work of the outer wall of the green building is guaranteed, and meanwhile the construction stability of the construction operation platform can be improved.
本发明涉及建筑外墙施工技术领域,具体是一种应用于绿色建筑外墙的安全施工方法,用于解决难以对施工工人做出全方位的防护处理,在雨雪天气中易对工人的施工安全带来负面影响,同时也无法保证绿色建筑外墙施工工作的正常进行的情况;本发明是对防护装置进行拼装,再将防护装置移动至靠近绿色建筑外墙的位置便于工人施工,实现对施工操作平台上的施工工人进行全方位的防护处理,保证绿色建筑外墙施工工作的正常进行的同时,还能够提升自身的施工稳定性。
Safe construction method applied to green building outer wall
The invention relates to the technical field of building outer wall construction, in particular to a safe construction method applied to a green building outer wall, and aims to solve the problems that all-around protection treatment is difficult to carry out on construction workers, negative effects are easily brought to construction safety of the workers in rainy and snowy weather, and construction safety is affected. And meanwhile, the normal operation of the construction work of the green building outer wall cannot be ensured. According to the construction operation platform, the protection device is spliced and then moved to the position close to the outer wall of the green building, construction of workers is facilitated, all-around protection treatment is conducted on the construction workers on the construction operation platform, normal operation of construction work of the outer wall of the green building is guaranteed, and meanwhile the construction stability of the construction operation platform can be improved.
本发明涉及建筑外墙施工技术领域,具体是一种应用于绿色建筑外墙的安全施工方法,用于解决难以对施工工人做出全方位的防护处理,在雨雪天气中易对工人的施工安全带来负面影响,同时也无法保证绿色建筑外墙施工工作的正常进行的情况;本发明是对防护装置进行拼装,再将防护装置移动至靠近绿色建筑外墙的位置便于工人施工,实现对施工操作平台上的施工工人进行全方位的防护处理,保证绿色建筑外墙施工工作的正常进行的同时,还能够提升自身的施工稳定性。
Safe construction method applied to green building outer wall
一种应用于绿色建筑外墙的安全施工方法
ZHAO YUE (author) / CHEN YUAN (author) / LI XIAOMENG (author) / DUAN FENGJIE (author) / LI YAN (author)
2024-11-26
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Green building thermal insulation outer wall structure and construction method
European Patent Office | 2023
|Green and energy-saving construction method for building outer wall
European Patent Office | 2020
|