Dismantling method of river-crossing double-cantilever aqueduct structure
The invention provides a dismantling method for a river-crossing double-cantilever aqueduct structure. The dismantling method comprises the following steps that firstly, blasting sections are divided; the aqueduct structure is divided into a left blasting section, a river-crossing blasting section and a right blasting section from left to right; 2, dividing blasting areas of all the blasting sections; thirdly, blast holes in all the blasting areas are constructed; step 4, charging explosives in each blast hole and installing a detonating element; 5, mounting a detonating network of each blasting section; step 6, detonating; the river-crossing blasting section is firstly detonated, then the left blasting section and the right blasting section are detonated by adopting a delayed detonating technology, the detonating direction of the left blasting section is from left to right, and the detonating direction of the right blasting section is from right to left; and 7, checking after explosion. According to the method, the construction efficiency of dismantling the river-crossing double-cantilever aqueduct structure is improved.
本发明提供了一种跨河双悬臂渡槽结构的拆除方法,其包括如下步骤:步骤一:爆破段划分;将渡槽结构从左至右划分为左侧爆破段、跨河爆破段和右侧爆破段;步骤二:各爆破段的爆破区划分;步骤三:各爆破区炮孔施工;步骤四:在各炮孔内装药并安装起爆元件;步骤五:各爆破段起爆网路安装;步骤六:起爆;先起爆跨河爆破段,然后采用延时起爆技术起爆左侧爆破段和右侧爆破段,左侧爆破段的起爆方向为从左至右,右侧爆破段的起爆方向为从右向左;步骤七:爆后检查。本发明提高了跨河双悬臂渡槽结构拆除的施工效率。
Dismantling method of river-crossing double-cantilever aqueduct structure
The invention provides a dismantling method for a river-crossing double-cantilever aqueduct structure. The dismantling method comprises the following steps that firstly, blasting sections are divided; the aqueduct structure is divided into a left blasting section, a river-crossing blasting section and a right blasting section from left to right; 2, dividing blasting areas of all the blasting sections; thirdly, blast holes in all the blasting areas are constructed; step 4, charging explosives in each blast hole and installing a detonating element; 5, mounting a detonating network of each blasting section; step 6, detonating; the river-crossing blasting section is firstly detonated, then the left blasting section and the right blasting section are detonated by adopting a delayed detonating technology, the detonating direction of the left blasting section is from left to right, and the detonating direction of the right blasting section is from right to left; and 7, checking after explosion. According to the method, the construction efficiency of dismantling the river-crossing double-cantilever aqueduct structure is improved.
本发明提供了一种跨河双悬臂渡槽结构的拆除方法,其包括如下步骤:步骤一:爆破段划分;将渡槽结构从左至右划分为左侧爆破段、跨河爆破段和右侧爆破段;步骤二:各爆破段的爆破区划分;步骤三:各爆破区炮孔施工;步骤四:在各炮孔内装药并安装起爆元件;步骤五:各爆破段起爆网路安装;步骤六:起爆;先起爆跨河爆破段,然后采用延时起爆技术起爆左侧爆破段和右侧爆破段,左侧爆破段的起爆方向为从左至右,右侧爆破段的起爆方向为从右向左;步骤七:爆后检查。本发明提高了跨河双悬臂渡槽结构拆除的施工效率。
Dismantling method of river-crossing double-cantilever aqueduct structure
一种跨河双悬臂渡槽结构的拆除方法
ZHOU LI (author) / LU HONGJUN (author) / LU CHAO (author) / LI JINHENG (author) / WEN WEITAO (author) / LI YAMIN (author) / TANG SHAOHUA (author) / FENG LEI (author) / ZHAO XIANLONG (author) / HE TAO (author)
2024-11-29
Patent
Electronic Resource
Chinese
Dismantling and rebuilding method for aqueduct body of medium-large aqueduct
European Patent Office | 2023
|European Patent Office | 2024
|Ultrahigh aqueduct local dismantling and rebuilding system and construction method
European Patent Office | 2022
|Aqueduct crossing under the red river, for Winnipeg water supply
Engineering Index Backfile | 1919
|Cantilever steel structure construction temporary support dismantling method
European Patent Office | 2023
|