Prefabricated and assembled integral type monorail train tunnel structure and construction method
The invention discloses a prefabricated and assembled integral type monorail train tunnel structure and a construction method, and aims to solve the problems of low construction efficiency and high risk of a cast-in-place component construction mode of an existing monorail train tunnel structure. The device mainly comprises a box culvert arranged at the bottom of a tunnel, drainage grooves formed in the two sides of the box culvert, anti-seismic connecting plates arranged on the two sides of the top of the box culvert and horizontally arranged, stand columns arranged on the top of the box culvert, track beams arranged above the stand columns and evacuation corridors arranged on the two side walls of the tunnel. The duct pieces, the box culverts and the track beams are all concrete prefabricated parts, and the drainage grooves, the anti-seismic connecting plates and the stand columns are all concrete cast-in-place parts. Tunnel structure construction is completed through assembly of the prefabricated box culverts and the track beams, the construction efficiency can be greatly improved, production of prefabricated parts is not affected by weather and environmental factors, and the construction risk during on-site construction of the parts is reduced.
本申请公开了一种预制装配整体式单轨列车隧道结构及施工方法,旨在解决现有单轨列车隧道结构的现浇构件施工方式存在施工效率低、风险大的问题。其主要包括设于隧道底部的箱涵、设于所述箱涵两侧的排水槽、设于所述箱涵顶部两侧并水平设置的抗震连接板、设于所述箱涵顶部的立柱、设于所述立柱上方的轨道梁、设于隧道两侧壁上的疏散走廊;所述管片、箱涵、轨道梁均为砼制预制构件,所述排水槽、抗震连接板、立柱均为砼制现浇构件。本申请通过预制的箱涵、轨道梁装配完成隧道结构施工,可大大提高施工效率,且预制件的生产不受天气、环境因素影响,降低了构件现场施作时的施工风险。
Prefabricated and assembled integral type monorail train tunnel structure and construction method
The invention discloses a prefabricated and assembled integral type monorail train tunnel structure and a construction method, and aims to solve the problems of low construction efficiency and high risk of a cast-in-place component construction mode of an existing monorail train tunnel structure. The device mainly comprises a box culvert arranged at the bottom of a tunnel, drainage grooves formed in the two sides of the box culvert, anti-seismic connecting plates arranged on the two sides of the top of the box culvert and horizontally arranged, stand columns arranged on the top of the box culvert, track beams arranged above the stand columns and evacuation corridors arranged on the two side walls of the tunnel. The duct pieces, the box culverts and the track beams are all concrete prefabricated parts, and the drainage grooves, the anti-seismic connecting plates and the stand columns are all concrete cast-in-place parts. Tunnel structure construction is completed through assembly of the prefabricated box culverts and the track beams, the construction efficiency can be greatly improved, production of prefabricated parts is not affected by weather and environmental factors, and the construction risk during on-site construction of the parts is reduced.
本申请公开了一种预制装配整体式单轨列车隧道结构及施工方法,旨在解决现有单轨列车隧道结构的现浇构件施工方式存在施工效率低、风险大的问题。其主要包括设于隧道底部的箱涵、设于所述箱涵两侧的排水槽、设于所述箱涵顶部两侧并水平设置的抗震连接板、设于所述箱涵顶部的立柱、设于所述立柱上方的轨道梁、设于隧道两侧壁上的疏散走廊;所述管片、箱涵、轨道梁均为砼制预制构件,所述排水槽、抗震连接板、立柱均为砼制现浇构件。本申请通过预制的箱涵、轨道梁装配完成隧道结构施工,可大大提高施工效率,且预制件的生产不受天气、环境因素影响,降低了构件现场施作时的施工风险。
Prefabricated and assembled integral type monorail train tunnel structure and construction method
预制装配整体式单轨列车隧道结构及施工方法
REN CHENGGUO (author) / GE CHAO (author) / WANG JUNPENG (author) / QIAO FEI (author) / LIU CHUNSONG (author) / ZHOU LIN (author) / YAN YUE (author) / SUN QINGTIAN (author) / YANG ZHENCHUAN (author) / CHEN YULIN (author)
2024-11-29
Patent
Electronic Resource
Chinese
IPC:
E21D
SHAFTS
,
Schächte
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
Prefabricated assembled tunnel joint structure and construction method thereof
European Patent Office | 2015
|Prefabricated assembled utility tunnel structure and construction method thereof
European Patent Office | 2020
|Straddle type monorail tunnel fabricated track structure and construction method thereof
European Patent Office | 2024
|Secondary pouring type track structure suitable for monorail tunnel and construction method
European Patent Office | 2023
|