A platform for research: civil engineering, architecture and urbanism
Integral lifting installation construction method for steel structure inclined strut ceiling joist
The invention relates to the technical field of building decoration construction, and discloses a steel structure inclined strut ceiling joist integral lifting installation construction method which comprises the following specific steps: S1, surveying and setting out, compounding existing control point positions, arranging a corner lead net, and establishing a control net for steel structure inclined strut ceiling joist construction; s2, deepening the structure of the steel structure ceiling joist, and applying the BIM technology to cooperate with the design of the steel structure ceiling joist to carry out the deepening work of the structure of the steel structure ceiling joist; s3, designing and manufacturing a hoisting device according to computer theoretical data; s4, the hoisting device is installed; s5, the steel structure ceiling joists are spliced on the ground according to a construction drawing; and S6, the steel structure ceiling joist is integrally lifted through the lifting device. The construction safety and the construction period can be effectively guaranteed, the construction cost is saved, and the construction safety can be effectively guaranteed; the construction design level is high, the scheme is flexible, simple and convenient, the application scene range is wide, and generalizability is high.
本发明涉及建筑装饰装修施工技术领域,且公开了一种钢结构斜撑吊顶龙骨整体提升安装施工方法,具体步骤如下:S1、测量放线,复合已有控制点位,布置边角导线网,建立钢结构斜撑吊顶龙骨施工用控制网;S2、钢结构吊顶龙骨结构深化,运用BIM技术配合钢结构吊顶龙骨设计展开钢结构吊顶龙骨结构深化工作;S3、根据计算机理论数据设计并制作吊运装置;S4、所述吊运装置安装;S5、按照施工图纸,将钢结构吊顶龙骨在地面进行拼装;S6、通过吊运装置将钢结构吊顶龙骨整体提升。不但能够有效保证施工安全和施工周期、节约施工成本,而且能够有效保证施工安全;施工设计水平一流,方案灵活简便,适用场景范围广,可推广性高。
Integral lifting installation construction method for steel structure inclined strut ceiling joist
The invention relates to the technical field of building decoration construction, and discloses a steel structure inclined strut ceiling joist integral lifting installation construction method which comprises the following specific steps: S1, surveying and setting out, compounding existing control point positions, arranging a corner lead net, and establishing a control net for steel structure inclined strut ceiling joist construction; s2, deepening the structure of the steel structure ceiling joist, and applying the BIM technology to cooperate with the design of the steel structure ceiling joist to carry out the deepening work of the structure of the steel structure ceiling joist; s3, designing and manufacturing a hoisting device according to computer theoretical data; s4, the hoisting device is installed; s5, the steel structure ceiling joists are spliced on the ground according to a construction drawing; and S6, the steel structure ceiling joist is integrally lifted through the lifting device. The construction safety and the construction period can be effectively guaranteed, the construction cost is saved, and the construction safety can be effectively guaranteed; the construction design level is high, the scheme is flexible, simple and convenient, the application scene range is wide, and generalizability is high.
本发明涉及建筑装饰装修施工技术领域,且公开了一种钢结构斜撑吊顶龙骨整体提升安装施工方法,具体步骤如下:S1、测量放线,复合已有控制点位,布置边角导线网,建立钢结构斜撑吊顶龙骨施工用控制网;S2、钢结构吊顶龙骨结构深化,运用BIM技术配合钢结构吊顶龙骨设计展开钢结构吊顶龙骨结构深化工作;S3、根据计算机理论数据设计并制作吊运装置;S4、所述吊运装置安装;S5、按照施工图纸,将钢结构吊顶龙骨在地面进行拼装;S6、通过吊运装置将钢结构吊顶龙骨整体提升。不但能够有效保证施工安全和施工周期、节约施工成本,而且能够有效保证施工安全;施工设计水平一流,方案灵活简便,适用场景范围广,可推广性高。
Integral lifting installation construction method for steel structure inclined strut ceiling joist
一种钢结构斜撑吊顶龙骨整体提升安装施工方法
ZHANG XIAODONG (author) / FAN YILING (author) / LU GANG (author) / DAI CHAO (author) / LIU QICHAO (author) / WANG HUICHAO (author) / WU XIONGFEI (author) / YANG XIAOLEI (author) / CHENG JIANGANG (author) / LIU ZHIGUANG (author)
2024-12-13
Patent
Electronic Resource
Chinese
CEILING JOIST INSTALLATION METAL FITTING, AND SEISMIC REINFORCEMENT STRUCTURE FOR CEILING JOIST
European Patent Office | 2017
|Decoration project ceiling joist installation and construction technology
European Patent Office | 2024
|Integrated splicing type ceiling joist and ceiling installation method thereof
European Patent Office | 2021
|