Garden road construction process
The invention relates to a garden road construction process, which belongs to the field of road construction, and comprises the following steps: S1, excavating a road foundation pit; s2, a guide sliding rail is arranged, and a hoisting trolley is installed on the guide sliding rail; s3, a drainage base is laid at the bottom of the road foundation pit through the hoisting trolley, and the drainage base is provided with a drainage through groove; s4, a waterproof structure is laid on the bottom face of the drainage through groove; s5, a road panel is installed on the top face of the drainage base through the hoisting trolley; s6, the hoisting trolley and the guide sliding rail are dismantled; and S7, the road foundation pit is filled with soil. The garden road construction device has the effect of reducing the labor intensity of operators in the garden road construction process.
本申请涉及一种园林道路施工工艺,属于道路施工领域,其包括以下步骤:S1、道路基坑开挖;S2、设置导向滑轨并在导向滑轨上安装吊装小车;S3、通过吊装小车在道路基坑底部铺设排水基座,排水基座具有排水通槽;S4、在排水通槽的底面铺设防水结构;S5、通过吊装小车在排水基座的顶面安装道路面板;S6、拆除吊装小车和导向滑轨;S7、对道路基坑进行填土。本申请具有降低园林道路施工过程中操作人员的劳动强度的效果。
Garden road construction process
The invention relates to a garden road construction process, which belongs to the field of road construction, and comprises the following steps: S1, excavating a road foundation pit; s2, a guide sliding rail is arranged, and a hoisting trolley is installed on the guide sliding rail; s3, a drainage base is laid at the bottom of the road foundation pit through the hoisting trolley, and the drainage base is provided with a drainage through groove; s4, a waterproof structure is laid on the bottom face of the drainage through groove; s5, a road panel is installed on the top face of the drainage base through the hoisting trolley; s6, the hoisting trolley and the guide sliding rail are dismantled; and S7, the road foundation pit is filled with soil. The garden road construction device has the effect of reducing the labor intensity of operators in the garden road construction process.
本申请涉及一种园林道路施工工艺,属于道路施工领域,其包括以下步骤:S1、道路基坑开挖;S2、设置导向滑轨并在导向滑轨上安装吊装小车;S3、通过吊装小车在道路基坑底部铺设排水基座,排水基座具有排水通槽;S4、在排水通槽的底面铺设防水结构;S5、通过吊装小车在排水基座的顶面安装道路面板;S6、拆除吊装小车和导向滑轨;S7、对道路基坑进行填土。本申请具有降低园林道路施工过程中操作人员的劳动强度的效果。
Garden road construction process
一种园林道路施工工艺
YANG MENG'EN (author) / XIE MO (author) / WANG SHUBO (author) / XIA YANGMING (author) / LI QICHEN (author)
2024-12-24
Patent
Electronic Resource
Chinese