A platform for research: civil engineering, architecture and urbanism
VERFAHREN ZUM ERSTELLEN VON VORGESPANNTEN BAUWERKEN UND BAUTEILEN MITTELS SMA-ZUGELEMENTEN SOWIE DAMIT AUSGERÜSTETES BAUWERK UND BAUTEIL
The method includes a tension element, for example in the form of flat steel, that is placed on the structure or structural part and can be guided around a corner. The flat steel can also wrap as a band around the structure, in which the two ends of the flat steel are either connected to one another or are separately connected to the structure by the end anchors or intersect to produce a clamping connection. The flat steel contracts as a result of a subsequent active and controlled input of heat using a heating element and generates a permanent tensile stress and, correspondingly, a permanent prestress on the structure. The structure, as equipped, has at least one tension element as a shape memory alloy which extends along the outer side of the structure and is connected by one or more end anchors.
VERFAHREN ZUM ERSTELLEN VON VORGESPANNTEN BAUWERKEN UND BAUTEILEN MITTELS SMA-ZUGELEMENTEN SOWIE DAMIT AUSGERÜSTETES BAUWERK UND BAUTEIL
The method includes a tension element, for example in the form of flat steel, that is placed on the structure or structural part and can be guided around a corner. The flat steel can also wrap as a band around the structure, in which the two ends of the flat steel are either connected to one another or are separately connected to the structure by the end anchors or intersect to produce a clamping connection. The flat steel contracts as a result of a subsequent active and controlled input of heat using a heating element and generates a permanent tensile stress and, correspondingly, a permanent prestress on the structure. The structure, as equipped, has at least one tension element as a shape memory alloy which extends along the outer side of the structure and is connected by one or more end anchors.
VERFAHREN ZUM ERSTELLEN VON VORGESPANNTEN BAUWERKEN UND BAUTEILEN MITTELS SMA-ZUGELEMENTEN SOWIE DAMIT AUSGERÜSTETES BAUWERK UND BAUTEIL
PROCESS FOR PROVIDING PRE-STRESSED CONSTRUCTIONS AND ELEMENTS BY SMA TENSIONNING ELEMENTS AND A CONSTRUCTION AND ELEMENT FITTED WITH SUCH SMA TENSIONNING ELEMENTS
PROCÉDURE POUR CONSTRUIRE DES STRUCTURES PRÉCONTRAINTES ET DES ÉLÉMENTS PRÉCONTRAINTS PAR DES ÉLÉMENTS DE PRÉCONTRAINTE EN AMF ET UNE STRUCTURE ET UN ÉLÉMENT ÉQUIPÉS D'UN TEL ÉLÉMENT DE PRÉCONTRAINTE
MOTAVALLI MASOUD (author) / WEBER BENEDIKT (author) / LEE WOOKIJN (author) / BRÖNNIMANN ROLF (author) / CZADERSKI CHRISTOPH (author) / LEINENBACH CHRISTIAN (author) / SHAHVERDI MOSLEM (author) / MICHELS JULIEN (author)
2024-06-26
Patent
Electronic Resource
German
European Patent Office | 2016
|European Patent Office | 2018
|Verriegelungsmechanismus sowie damit ausgerüstetes Fahrzeug
European Patent Office | 2023
|RETTUNGSKORB, SOWIE DAMIT AUSGERÜSTETES HUBRETTUNGSFAHRZEUG
European Patent Office | 2019
|RETTUNGSKORB, SOWIE DAMIT AUSGERÜSTETES HUBRETTUNGSFAHRZEUG
European Patent Office | 2016
|