A platform for research: civil engineering, architecture and urbanism
FÖRDER- UND TRANSPORTSYSTEM FÜR TUNNELBAUWERKE
The invention relates to a conveying and transport system for tunnel constructions, having a twin-rail overhead track system which comprises a roof-mounted track (1) consisting of two lines (2, 3) of rails (4) arranged parallel alongside one another. The rails (4) are suspended by means of a support structure (5) on the roof ridge (F) of the tunnel construction. Carriages (7; 7a - 7d) are conveyed on the rail lines (2, 3) by means of bogies (6). According to the invention, at least some of the carriages (7, 7a - 7d) are equipped with lifting gear (29). Furthermore, a number of carriages (7, 7a) have a gripping device (35) in the form of segment grabs.
FÖRDER- UND TRANSPORTSYSTEM FÜR TUNNELBAUWERKE
The invention relates to a conveying and transport system for tunnel constructions, having a twin-rail overhead track system which comprises a roof-mounted track (1) consisting of two lines (2, 3) of rails (4) arranged parallel alongside one another. The rails (4) are suspended by means of a support structure (5) on the roof ridge (F) of the tunnel construction. Carriages (7; 7a - 7d) are conveyed on the rail lines (2, 3) by means of bogies (6). According to the invention, at least some of the carriages (7, 7a - 7d) are equipped with lifting gear (29). Furthermore, a number of carriages (7, 7a) have a gripping device (35) in the form of segment grabs.
FÖRDER- UND TRANSPORTSYSTEM FÜR TUNNELBAUWERKE
CONVEYING AND TRANSPORT SYSTEM FOR TUNNEL CONSTRUCTIONS
SYSTÈME D'ACHEMINEMENT ET DE TRANSPORT DE STRUCTURES DE TUNNEL
MEYER STEFAN (author) / WILZEWSKI NORBERT (author) / SCHÄPER WILFRIED (author)
2021-02-24
Patent
Electronic Resource
German
IPC:
E21D
SHAFTS
,
Schächte
/
B61B
RAILWAY SYSTEMS
,
Eisenbahnanlagen
/
E01B
PERMANENT WAY
,
Gleisoberbau
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
CTRL‐Tunnelbauwerke – TBM‐Vortriebe beendet
Wiley | 2004
|Validierung eines Berechnungsverfahrens für Tunnelbauwerke in quellfähigem Gebirge
UB Braunschweig | 2009
|