A platform for research: civil engineering, architecture and urbanism
VERFAHREN ZUM VERDICHTEN VON SCHOTTER EINER GLEISBETTUNG
A method for compacting ballast of a trackbed uses a tamping machine (A) that can travel on tracks in a working direction (W) and that is equipped with tamping tools (6, 16, 17, 18) for tamping, wherein the tamping tools are associated with tamping assemblies (1, 2, 3, 4) that can be moved vertically independently of one another and can be moved relative to one another transversely to the working direction (W) by means of a transverse movement drive (31). The tamping assemblies (1, 3 and 2, 4) are shifted relative to one another by a distance dV by means of the transverse movement drive (31) such that the mutually facing inner tamping tools of the tamping assemblies are offset relative to one another with a gap, and such that the opening width of the inner tamping tools is increased by an amount (d01,3i, d02,4i) such that the inner tamping tools at least partially overlap when viewed transversely to the working direction (W).
VERFAHREN ZUM VERDICHTEN VON SCHOTTER EINER GLEISBETTUNG
A method for compacting ballast of a trackbed uses a tamping machine (A) that can travel on tracks in a working direction (W) and that is equipped with tamping tools (6, 16, 17, 18) for tamping, wherein the tamping tools are associated with tamping assemblies (1, 2, 3, 4) that can be moved vertically independently of one another and can be moved relative to one another transversely to the working direction (W) by means of a transverse movement drive (31). The tamping assemblies (1, 3 and 2, 4) are shifted relative to one another by a distance dV by means of the transverse movement drive (31) such that the mutually facing inner tamping tools of the tamping assemblies are offset relative to one another with a gap, and such that the opening width of the inner tamping tools is increased by an amount (d01,3i, d02,4i) such that the inner tamping tools at least partially overlap when viewed transversely to the working direction (W).
VERFAHREN ZUM VERDICHTEN VON SCHOTTER EINER GLEISBETTUNG
METHOD FOR COMPACTING BALLAST OF A TRACKBED
PROCÉDÉ DE COMPACTAGE DE BALLAST DE VOIE FERRÉE
LICHTBERGER BERNHARD (author) / SÖLLINGER MARKUS (author)
2025-03-12
Patent
Electronic Resource
German
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Verfahren zum Verdichten von Schotter einer Gleisbettung
European Patent Office | 2022
|VERFAHREN ZUM VERDICHTEN VON SCHOTTER EINER GLEISBETTUNG
European Patent Office | 2023
|IuD Bahn | 1995
|