A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide a construction method for an underground tunnel in which a tunnel construction space is excavated without installing a strut and a tunnel is constructed using a precast member, in an attempt to curtail the construction period and reduce the construction costs significantly.SOLUTION: A pair of side walls 2 is formed by installing a plurality of side wall segments 1 in a ground 55. Next, a pile cap 20 is formed by alternately constructing a pile cap segment 25 and a pile cap segment 41 on the top edge of the pair of side walls 2, in the tunnel axial direction. Then, a rod 77 for ground improvement is made to pass through an opening 73 made on the pile cap 20 and a through-hole 51 for base ground improvement pierced through the pile cap segment 41, from the top surface side to the bottom surface side of the pile cap 20. Finally, the ground 55 between the pair of side walls 2 is excavated for forming a bottom slab above a preceding underground beam 83, by casting bottom slab concrete 91.
【課題】切梁を設置せずにトンネル構築スペースを掘削し、プレキャスト部材を用いてトンネルを構築することにより、大幅な工期短縮と工費削減を図れる地下トンネルの構築方法を提供すること。【解決手段】地盤55中に複数の側壁セグメント1を設置して、一対の側壁2を形成する。次に、一対の側壁2の上端に、頂版セグメント25と頂版セグメント41とをトンネル軸方向に交互に架設して頂版20を形成する。その後、頂版20に設けられた開口73や、頂版セグメント41に設けられた底盤改良用孔51を介して、頂版20の上面側から下面側に地盤改良用のロッド77を貫通させ、一対の側壁2の間の地盤55を改良して先行地中梁83を形成する。そして、一対の側壁2の間の地盤55を掘削し、先行地中梁83の上方に、底版コンクリート91を打設して底版を形成する。【選択図】図5
PROBLEM TO BE SOLVED: To provide a construction method for an underground tunnel in which a tunnel construction space is excavated without installing a strut and a tunnel is constructed using a precast member, in an attempt to curtail the construction period and reduce the construction costs significantly.SOLUTION: A pair of side walls 2 is formed by installing a plurality of side wall segments 1 in a ground 55. Next, a pile cap 20 is formed by alternately constructing a pile cap segment 25 and a pile cap segment 41 on the top edge of the pair of side walls 2, in the tunnel axial direction. Then, a rod 77 for ground improvement is made to pass through an opening 73 made on the pile cap 20 and a through-hole 51 for base ground improvement pierced through the pile cap segment 41, from the top surface side to the bottom surface side of the pile cap 20. Finally, the ground 55 between the pair of side walls 2 is excavated for forming a bottom slab above a preceding underground beam 83, by casting bottom slab concrete 91.
【課題】切梁を設置せずにトンネル構築スペースを掘削し、プレキャスト部材を用いてトンネルを構築することにより、大幅な工期短縮と工費削減を図れる地下トンネルの構築方法を提供すること。【解決手段】地盤55中に複数の側壁セグメント1を設置して、一対の側壁2を形成する。次に、一対の側壁2の上端に、頂版セグメント25と頂版セグメント41とをトンネル軸方向に交互に架設して頂版20を形成する。その後、頂版20に設けられた開口73や、頂版セグメント41に設けられた底盤改良用孔51を介して、頂版20の上面側から下面側に地盤改良用のロッド77を貫通させ、一対の側壁2の間の地盤55を改良して先行地中梁83を形成する。そして、一対の側壁2の間の地盤55を掘削し、先行地中梁83の上方に、底版コンクリート91を打設して底版を形成する。【選択図】図5
CONSTRUCTION METHOD FOR UNDERGROUND TUNNEL
地下トンネルの構築方法
OKUBO KENJI (author)
2015-06-25
Patent
Electronic Resource
Japanese
Tunnel construction for underground steam pipes
Engineering Index Backfile | 1902
European Patent Office | 2021
|Construction method of underground structure crossing existing tunnel
European Patent Office | 2023
|