A platform for research: civil engineering, architecture and urbanism
METHOD FOR FORMING THROUGH-HOLE IN DAM BODY
PROBLEM TO BE SOLVED: To form a through-hole in a dam body efficiently, while controlling vibration at the time of excavation.SOLUTION: A method for forming a though-hole 3 in an existing dam body 1 comprises: a process for forming a first space 6 of the through-hole 3 in the dam body 1 by excavating the dam body 1 with a free cross-section excavator 5 from the downstream side to the upstream side, leaving a prescribed unexcavated section 30 at the end of the dam body 1 on the upstream side; a process for forming a plurality of boreholes through the prescribed unexcavated section 30 of the dam body 1, continuously through the upstream side of the dam body 1 and the first space 6; a process for inserting a wire saw 11 through the plurality of boreholes; a process for dividing the prescribed unexcavated section 30 of the dam body 1 into a plurality of concrete blocks CB1 to CB16, using the wire saw 11; and a process for forming a second space 9 of the through-hole 3 at the end of the dam body 1 on the upstream side, by carrying out the concrete blocks CB1 to CB16 from the upstream side of the dam body 1.
【課題】ダム堤体に貫通孔を効率良く形成すると共に孔貫通時の振動の発生を抑制する。【解決手段】既設のダム堤体1に貫通孔3を形成する方法として、ダム堤体1の上流側端部に所定の未掘削区間30を残すように、ダム堤体1を、その下流側から上流側に向かって自由断面掘削機5によって掘削することにより、ダム堤体1に貫通孔3の第1の空間6を形成する工程と、ダム堤体1の上流側と第1の空間6とを連通するように、ダム堤体1の所定の未掘削区間30に複数のボーリング孔を形成する工程と、複数のボーリング孔にワイヤーソー11を通す工程と、ワイヤーソー11を用いて、ダム堤体1の所定の未掘削区間30を複数のコンクリートブロックCB1〜CB16に分割する工程と、コンクリートブロックCB1〜CB16をダム堤体1の上流側より搬出することによって、ダム堤体1の上流側端部に貫通孔3の第2の空間9を形成する工程と、を含む。【選択図】図6
METHOD FOR FORMING THROUGH-HOLE IN DAM BODY
PROBLEM TO BE SOLVED: To form a through-hole in a dam body efficiently, while controlling vibration at the time of excavation.SOLUTION: A method for forming a though-hole 3 in an existing dam body 1 comprises: a process for forming a first space 6 of the through-hole 3 in the dam body 1 by excavating the dam body 1 with a free cross-section excavator 5 from the downstream side to the upstream side, leaving a prescribed unexcavated section 30 at the end of the dam body 1 on the upstream side; a process for forming a plurality of boreholes through the prescribed unexcavated section 30 of the dam body 1, continuously through the upstream side of the dam body 1 and the first space 6; a process for inserting a wire saw 11 through the plurality of boreholes; a process for dividing the prescribed unexcavated section 30 of the dam body 1 into a plurality of concrete blocks CB1 to CB16, using the wire saw 11; and a process for forming a second space 9 of the through-hole 3 at the end of the dam body 1 on the upstream side, by carrying out the concrete blocks CB1 to CB16 from the upstream side of the dam body 1.
【課題】ダム堤体に貫通孔を効率良く形成すると共に孔貫通時の振動の発生を抑制する。【解決手段】既設のダム堤体1に貫通孔3を形成する方法として、ダム堤体1の上流側端部に所定の未掘削区間30を残すように、ダム堤体1を、その下流側から上流側に向かって自由断面掘削機5によって掘削することにより、ダム堤体1に貫通孔3の第1の空間6を形成する工程と、ダム堤体1の上流側と第1の空間6とを連通するように、ダム堤体1の所定の未掘削区間30に複数のボーリング孔を形成する工程と、複数のボーリング孔にワイヤーソー11を通す工程と、ワイヤーソー11を用いて、ダム堤体1の所定の未掘削区間30を複数のコンクリートブロックCB1〜CB16に分割する工程と、コンクリートブロックCB1〜CB16をダム堤体1の上流側より搬出することによって、ダム堤体1の上流側端部に貫通孔3の第2の空間9を形成する工程と、を含む。【選択図】図6
METHOD FOR FORMING THROUGH-HOLE IN DAM BODY
ダム堤体における貫通孔の形成方法
TAKIGUCHI NORIO (author) / SUZUKI SATOSHI (author) / KAIZE YOSHIHARU (author) / FUJIWARA KENZO (author) / IWASAKI TOSHINORI (author) / KITAZAKI SHINJI (author) / MUTO NARIYUKI (author) / NISHIO AKIRA (author)
2015-08-06
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
THROUGH-HOLE FORMING TOOL AND THROUGH-HOLE FORMING METHOD
European Patent Office | 2020
|Construction method for upper expansion body precast pile through secondary compaction hole forming
European Patent Office | 2024
|