PROBLEM TO BE SOLVED: To provide a concrete placement system capable of suitably placing concrete underwater.SOLUTION: The concrete placement system 1 includes: a concrete transferring pump 7; piping for concrete placement 9; shutter valves 21, 23; a pressure measurement unit 27; a computer 32; display devices 33, 35; a lifting device 37; and a GPS antenna 37b. The piping for concrete placement 9 is a pipeline with one end connected to the concrete transferring pump 7 and the other extending underwater. The piping for concrete placement 9 includes: a water-surface piping part 9a; a flexible piping part 9b; and an underwater piping part 9c. The flexible piping part 9b floats above the water and can move freely by operation of the lifting device 37. The pressure measurement unit 27 measures pressure in the piping immediately before the flexible piping part 9b.
【課題】水中でのコンクリートの打設を好適に行えるコンクリート打設システムを提供する。【解決手段】コンクリート打設システム1は、コンクリート圧送用ポンプ7、コンクリート打設用配管9、シャッターバルブ21、23、圧力計測部27、コンピュータ32、表示装置33、35、揚重装置37、GPSアンテナ37b等からなる。コンクリート打設用配管9は、一端がコンクリート圧送用ポンプ7に連結され、他端が水中に延びる配管である。コンクリート打設用配管9は、水上配管部9a、可とう性配管部9b、水中配管部9cから構成される。可とう性配管部9bは水面5上を浮遊し、揚重装置37の操作により自在に移動可能である。圧力計測部27は、可とう性配管部9bの直前で、配管内の圧力を計測する。【選択図】図1
CONCRETE PLACEMENT SYSTEM, CONCRETE PLACEMENT METHOD
PROBLEM TO BE SOLVED: To provide a concrete placement system capable of suitably placing concrete underwater.SOLUTION: The concrete placement system 1 includes: a concrete transferring pump 7; piping for concrete placement 9; shutter valves 21, 23; a pressure measurement unit 27; a computer 32; display devices 33, 35; a lifting device 37; and a GPS antenna 37b. The piping for concrete placement 9 is a pipeline with one end connected to the concrete transferring pump 7 and the other extending underwater. The piping for concrete placement 9 includes: a water-surface piping part 9a; a flexible piping part 9b; and an underwater piping part 9c. The flexible piping part 9b floats above the water and can move freely by operation of the lifting device 37. The pressure measurement unit 27 measures pressure in the piping immediately before the flexible piping part 9b.
【課題】水中でのコンクリートの打設を好適に行えるコンクリート打設システムを提供する。【解決手段】コンクリート打設システム1は、コンクリート圧送用ポンプ7、コンクリート打設用配管9、シャッターバルブ21、23、圧力計測部27、コンピュータ32、表示装置33、35、揚重装置37、GPSアンテナ37b等からなる。コンクリート打設用配管9は、一端がコンクリート圧送用ポンプ7に連結され、他端が水中に延びる配管である。コンクリート打設用配管9は、水上配管部9a、可とう性配管部9b、水中配管部9cから構成される。可とう性配管部9bは水面5上を浮遊し、揚重装置37の操作により自在に移動可能である。圧力計測部27は、可とう性配管部9bの直前で、配管内の圧力を計測する。【選択図】図1
CONCRETE PLACEMENT SYSTEM, CONCRETE PLACEMENT METHOD
コンクリート打設システム、コンクリート打設方法
TAKIGUCHI NORIO (author) / SUZUKI SATOSHI (author) / KAIZE YOSHIHARU (author) / FUJIWARA KENZO (author) / IWASAKI TOSHINORI (author) / KITAZAKI SHINJI (author) / NISHIO AKIRA (author) / IIDA KAZUHIRO (author)
2015-09-24
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|European Patent Office | 2023
|European Patent Office | 2023
|European Patent Office | 2023
|