A platform for research: civil engineering, architecture and urbanism
REPAIR STRUCTURE OF PILE-TYPE CONSTRUCTION AND REPAIR METHOD
PROBLEM TO BE SOLVED: To provide a repair structure of a pile-type construction which can shorten a length of a connecting part necessary for newly installing an upper construction of the pile-type construction to a steel pipe pile, and a repair method.SOLUTION: A repair structure of a pile-type construction which is supported to a pile comprises an existing steel pipe pile 12 and a new upper construction 20 which is supported to the existing steel pipe pile 12, and a reinforcing material 14 is arranged inside the existing steel pipe pile 12 within a range in which the reinforcing material does not reach a lower end of the existing steel pipe pile 12. The repair structure of the pile-type construction which is supported to the pile comprises the existing steel pipe pile 12 and a new upper construction 20 which is supported to the existing steel pipe pile 12, and a reinforcing material which reinforces the existing steel pipe pile 12, and shortens a length of a connecting part between the new upper construction 20 and the existing steel pipe pile 12 is arranged inside the existing steel pipe pile 12.
【課題】杭式構造物の上部工を既設の鋼管杭に新たに設置する際に必要な連結部の長さを短くすることが可能な杭式構造物の改修構造および改修工法を提供する。【解決手段】杭に支持された杭式構造物の改修構造であって、既設の鋼管杭12と、既設の鋼管杭12に支持された新設の上部工20と、を備え、既設の鋼管杭12の内側には、既設の鋼管杭12の下端に達しない範囲で補強材14が配置されている。杭に支持された杭式構造物の改修構造であって、既設の鋼管杭12と、既設の鋼管杭12に支持された新設の上部工20と、を備え、既設の鋼管杭12の内側には、既設の鋼管杭12を補強して、新設の上部工20と既設の鋼管杭12との連結部の長さを短くするための補強材が配置されている。【選択図】図1
REPAIR STRUCTURE OF PILE-TYPE CONSTRUCTION AND REPAIR METHOD
PROBLEM TO BE SOLVED: To provide a repair structure of a pile-type construction which can shorten a length of a connecting part necessary for newly installing an upper construction of the pile-type construction to a steel pipe pile, and a repair method.SOLUTION: A repair structure of a pile-type construction which is supported to a pile comprises an existing steel pipe pile 12 and a new upper construction 20 which is supported to the existing steel pipe pile 12, and a reinforcing material 14 is arranged inside the existing steel pipe pile 12 within a range in which the reinforcing material does not reach a lower end of the existing steel pipe pile 12. The repair structure of the pile-type construction which is supported to the pile comprises the existing steel pipe pile 12 and a new upper construction 20 which is supported to the existing steel pipe pile 12, and a reinforcing material which reinforces the existing steel pipe pile 12, and shortens a length of a connecting part between the new upper construction 20 and the existing steel pipe pile 12 is arranged inside the existing steel pipe pile 12.
【課題】杭式構造物の上部工を既設の鋼管杭に新たに設置する際に必要な連結部の長さを短くすることが可能な杭式構造物の改修構造および改修工法を提供する。【解決手段】杭に支持された杭式構造物の改修構造であって、既設の鋼管杭12と、既設の鋼管杭12に支持された新設の上部工20と、を備え、既設の鋼管杭12の内側には、既設の鋼管杭12の下端に達しない範囲で補強材14が配置されている。杭に支持された杭式構造物の改修構造であって、既設の鋼管杭12と、既設の鋼管杭12に支持された新設の上部工20と、を備え、既設の鋼管杭12の内側には、既設の鋼管杭12を補強して、新設の上部工20と既設の鋼管杭12との連結部の長さを短くするための補強材が配置されている。【選択図】図1
REPAIR STRUCTURE OF PILE-TYPE CONSTRUCTION AND REPAIR METHOD
杭式構造物の改修構造および改修工法
EBIHARA TOSHIHIRO (author) / TANAKA SACHITO (author)
2015-09-28
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
PILE FOUNDATION REPAIR METHOD, PILE FOUNDATION REPAIR KIT, AND PILE FOUNDATION STRUCTURE
European Patent Office | 2016
|Repair structure and repair method suitable for uplift pile
European Patent Office | 2024
|REPAIR METHOD AND REPAIR STRUCTURE OF STEEL SHEET PILE WATER PASSAGE
European Patent Office | 2019
|CONCRETE CONSTRUCTION REPAIR STRUCTURE AND CONCRETE CONSTRUCTION REPAIR METHOD
European Patent Office | 2017
|