ROLLING COMPACTION MANAGEMENT SYSTEM IN FILLING CONSTRUCTION
PROBLEM TO BE SOLVED: To enable not only a construction result and positional information to be visualized but also a rolling compaction completion result of any constructed elevation to be determined in a short period of time after rolling compaction of a vibratory roller to make a final finished shape in filling construction of a dam or the like.SOLUTION: In a site management system which obtains finished shape information by taking positional information with three-dimensional coordinates transmitted from a vibratory roller moving in a filling construction site to perform rolling compaction, a dam body filling construction site consisting of (A) a core filter area, (C) a rock area and (B) a boundary rock area therebetween having different finished thicknesses is set as a foundation shape divided into prescribed unit areas in advance, positional information with three-dimensional coordinates and rolling compaction information for each unit area transmitted from the vibratory roller are acquired, and a rolling compaction completion result corresponding to any elevation is output for each unit area on the basis of the elevation data of the positional information and the rolling compaction number data of the rolling compaction information.
【課題】ダム等の盛立工事において、最終出来形となる振動ローラの転圧後、その施工結果及び位置情報を可視化するだけでなく、施工した任意標高の転圧完了結果を短時間で判定できるようにする。【解決手段】盛立工事現場を移動して転圧する振動ローラから送信される三次元座標による位置情報を取り込んで出来形情報を得る現場管理システムにおいて、仕上り厚が異なる(A)コア・フィルターエリア、(C)ロックエリア、及びその間の(B)境界ロックエリアからなる堤体盛立工事現場を予め所定の単位面積に分割された基盤形状として設定しておき、振動ローラから送信される単位面積ごとの三次元座標による位置情報と転圧情報を取得し、その位置情報の標高データと転圧情報の転圧回数データに基づいて単位面積ごとに、任意標高に対応した転圧完了結果を出力する。【選択図】図10
ROLLING COMPACTION MANAGEMENT SYSTEM IN FILLING CONSTRUCTION
PROBLEM TO BE SOLVED: To enable not only a construction result and positional information to be visualized but also a rolling compaction completion result of any constructed elevation to be determined in a short period of time after rolling compaction of a vibratory roller to make a final finished shape in filling construction of a dam or the like.SOLUTION: In a site management system which obtains finished shape information by taking positional information with three-dimensional coordinates transmitted from a vibratory roller moving in a filling construction site to perform rolling compaction, a dam body filling construction site consisting of (A) a core filter area, (C) a rock area and (B) a boundary rock area therebetween having different finished thicknesses is set as a foundation shape divided into prescribed unit areas in advance, positional information with three-dimensional coordinates and rolling compaction information for each unit area transmitted from the vibratory roller are acquired, and a rolling compaction completion result corresponding to any elevation is output for each unit area on the basis of the elevation data of the positional information and the rolling compaction number data of the rolling compaction information.
【課題】ダム等の盛立工事において、最終出来形となる振動ローラの転圧後、その施工結果及び位置情報を可視化するだけでなく、施工した任意標高の転圧完了結果を短時間で判定できるようにする。【解決手段】盛立工事現場を移動して転圧する振動ローラから送信される三次元座標による位置情報を取り込んで出来形情報を得る現場管理システムにおいて、仕上り厚が異なる(A)コア・フィルターエリア、(C)ロックエリア、及びその間の(B)境界ロックエリアからなる堤体盛立工事現場を予め所定の単位面積に分割された基盤形状として設定しておき、振動ローラから送信される単位面積ごとの三次元座標による位置情報と転圧情報を取得し、その位置情報の標高データと転圧情報の転圧回数データに基づいて単位面積ごとに、任意標高に対応した転圧完了結果を出力する。【選択図】図10
ROLLING COMPACTION MANAGEMENT SYSTEM IN FILLING CONSTRUCTION
盛立工事における転圧管理システム
ISHIZUKI HISAYOSHI (author) / FUJITANI MASAYOSHI (author) / NAKANO TAKATSUNA (author) / HAZAMA YOSHIAKI (author)
2015-09-28
Patent
Electronic Resource
Japanese
ROLLING COMPACTION MANAGEMENT DEVICE FOR ROLLING COMPACTION MACHINE
European Patent Office | 2019
|ROLLING COMPACTION NUMBER PREDICTION SYSTEM AND ROLLING COMPACTION METHOD
European Patent Office | 2019
|PAVING/LEVELING AND ROLLING COMPACTION MANAGEMENT SYSTEM
European Patent Office | 2022
|